| Site: | Calvert Cliffs |
| Issue date: | 03/18/1981 |
| From: | Ash R BALTIMORE GAS & ELECTRIC CO. |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| IEB-79-25, NUDOCS 8104060024 | |
| Download: ML19350C563 (2) | |
Text
.O
/JDM f(Sb Grsk f ~.
BALTIMORE GAS AND ELECTRIC CHARLES CENTER. P.O. BOX 1475 BALTIMORE, MARYLAND 21203 ELEcTnic ENGINEERING 18,1h81 OgpAmyugNT e \\3$LIJ. -
Mr. Boyce H. Grier, Director 2
If V
Region I Office of Inspection and Enforcement 2-
'YR 011997 %
U. S. Nuclear Regulatory Commission p 48 kmu e%,on 631 Park Avenue King of Prussia, PA 19406 I
<\\
Calvert Cliffs Nuclear Power C'
Units Nos. 1 & 2, Dockets Nos. g '
Subject:
-318 IE Bulletin 79-25; Sunnlementarv Information
Reference:
BG',E letter from A. E. Lundvall, Jr. to B. H. Grier dated 12/27/79, same subject.
Dear Mr. Grier:
The above referenced letter stated that a periodic maintenance program would be implemented to insure the design performance of all BFD and NBFD relays used throughout the plant. The procedures for this program are as follows:
- 1) Clean each relay with cleaner and brush;
- 2) Check contacts for wear and pitting;
- 3) Check connections for tightness; h) Relays, in the normally energized position, vill be operated several times electrically and continuity of their "used" contacts checked.
Check all others for free movement.
Our periodic maintenance program has been established for testing and inspection on a yearly basis. We feel this is an appropriate time interval based on our lov failure rate for the described Westinghouse Type BFD relays. Documentation of any failures would be made in the form of a " Maintenance Request" which is retained on file at the Plant.
Very truly yours, R. F. Ash Chief Nuclear Engineer RFA/MHE/ssn D
ggA060