ML19350C328

From kanterella
Jump to navigation Jump to search
Forwards Operations Safety Evaluation Re Proposed Production Line Sys,Regulatory Compliance Manual,Alara Manual & Decommissioning Plan in Support of License Application
ML19350C328
Person / Time
Site: 07002909
Issue date: 12/22/1980
From: Dipiazza R
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Page R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML19350C329 List:
References
18190, WRD-LA-262, NUDOCS 8103310934
Download: ML19350C328 (1)


Text

M[)h f

WRD-LA-262 Westinghouse Water Reactor ex355 PittsburghPemsyfvania 15230 Electric Corporation Divisions December 22, 1980 U.S.

Nuclear Regulatory Commission Office of Nuclear Material Safety & Safeguards Division of Fuel Cycle & Material Safety Washington, D.C.

20555 Attention:

Mr.

R.

G. Page, Chief Uranium Process Licensing Branch

Subject:

Safety Demonstration in Support of Application for License Alabama Nuclear Fuel Fabrication Plant Docket No. 70-2909 Gentlemen:

The Westinghouse Electric Corporation hereby transmits additional information to the NRC in support of our License Application for

.the Alabama Nuclear Fuel Fabrication Plant (Docket No. 70-2909) to be located near Prattville, Alabama.

The information included'with this transmittal consists of ten (10) copies - of a detailed operations safety evaluation of - the proposed production line system, a Regulatory Compliance Manual, an ALALA

-Manual, and'a Decommissioning Plan. We will appreciate your timely review of this information such that the schedule for processing the11icense application can be' maintained.

Please note that all formal correspondence from the NRC regarding

-this application is to be sent to my attention at the above

' address.

If you have any questions regarding this matter, please write me i

at-the above address, or telephone me on 412/373-4652.

Very truly yours, t

i Ronald P. DiPiazza, Manager.

' ~'-

.NES License Administration t-18130 '

D s2os32oA31

)

L_