ML19350C145
| ML19350C145 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 03/27/1981 |
| From: | Bryan J UNION ELECTRIC CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| ULNRC-430, NUDOCS 8103310217 | |
| Download: ML19350C145 (4) | |
Text
-
g
=
'.b' UNION ELECTRIC COMPANY ison anArior synner Sr. Louis. Mtesouns
- ~ ~........
so-~ m.m~
.1.t.o? *;,*.% =.....
"" - -~'-
March 27, 1981
'Mr.' Harold R..'Denton
' Director of Nuclear Reactor Regulation 3-U.S. Nuclear Regulatory Commission
~
-Washington, D.C.
20"55
Dear Mr. Denton:
ULNRC 4 30 DOCKET NUMBERS'50-483 AND 50-486
'CALLAWAY PLANT UNITS 1 & 2 FINAL SAFETY ANALYSIS REPORT
Reference:
1NRC Letter' dated February 12, 1981, signed'by R.'L. Tedesco
..The_ referenced letter, requested additional information-
_concerning the Callaway! Plant FSAR.
Transmitted herewith are
~
-responses'to:theLquestions in the' referenced letter.
This-
~
-information will be_ formally _ incorporated into the'Callaway Plant-
- FSAR;in-the
- next revision.- The iniermation is hereby
~
incorporated._into-the Callaway Application.
- .n V
truly;yours,-
Y.y D
a John K.
'iyan
- DS/hfg.
Jd[30zqg.l
/ 'u1 L-u,5
$W^
C#,
'81088101N 4
f a
.m s
STATE OF MISSOURI )
.i
)
SS lJ CITY OF-ST. LOUIS )
Robert J.
Schukai, of lawful age, being first duly _ sworn upon oath says-that he is General Manager-Engineering (Nuclear) for Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on i
behalf of said-company with full power and authority to do so; and that" the -facts therein stated are true and correct to the best of his knowledge,'information and belief.-
By L
p a2 Ro@rt J.'
ukai
-Genbral M-ager-Engineering Nuclear
=- SUBSCRIBED and' sworn to 5 fore me this 27th day of March, 1981
/
s AA"
( 'Q' lstd.<d, u
-ht4<su )W
- ! s / s - w
./
PhTR?CM MIN DORR!S HOTARY ruBLsC, STATE OF MISSOURI 1
m MY COW.uss:ON EXPmts 1/31/C2 SL LOU 3 COTHT l
l e
t
\\
I t
5 t-
~
s.
k i
~
4.'
~
N i
- =
' cc : - Glenn L. Koester Vice President:
Operations Kansas Gas & Electric P.O.
Box 208 Wichita, Kansas 67201 1
John-E. Arthur Chief Engineer Rochester Gas & Electric Company 89 East Avenue.
. Rochester, New York-14649 A. V.
Dienhart JVice President Plant; Engineering-and Construction Northern States Power 414 Nicollet Mall 111nneapolis, - Minnesota 55401 Donald T. McPhee:
Vice Presidenti
-' r Kansas' City Power'and Light Company
-1330 Baltimore' Avenue Kansas City,1 Missouri 64141 Gerald.Charnoff,-Esq.
-- Sh aw, Pittman', Potts & Trowbridge
.1810.M;1 Street, N.W.
Washington, D.C.
20036 Nicholas-A. Petrick Executive Director SNUPPS:
5-Choke Cherry Road 1
'Rockville, Maryland _ 20850
'W. Hansen Callaway' Resident-Office-
. U.S. Nuclear Regulatory Commission
~
E RR$ 1" Steedman,-Missouri; 65077 b
f t
s a
u um u
sh a
m.
m m
m
SNUPPS-C Item 360.lc Section 2.4.13.3 of the SNUPPS/Callaway Site (15.7.3, Addendum discusses accident effects of postu-2.4.13) lated tank ruptures.
Table 2.4-28 lists those tanks which were chosen for the tank failure analysis and the curie content for important radionuclides.
Supply information on the methodology that is used to determine the frac-tion of the radioactivity expected to remain on the resin and the fraction expected to go into the liquid.
Response
In the postulated tank rupture analysis contained in Section 2.4.13.3, it was conservatively assumed that all radioactivity would go into the liquid.
,s l-I' i
i-I i.
F 360.l'C-1 i
--