Responds to NRC Lists of Deficiencies Re Preliminary Review of Environ Qualification of safety-related Electrical Equipment.Concludes That Plant Can Continue to Operate in Safe Manner.License Should Not Be Modified or Suspended
ML19350C084
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/26/1981
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Novak T
Office of Nuclear Reactor Regulation
References
1R-0381-09, 1R-381-9, NUDOCS 8103300391
Download: ML19350C084 (3)


Text

.

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE POCK. AAKANSAS 72203 '501) 371-4000 March 26, 1981 in e

Yh 1R-0381-09 D%

8$

'O

]9.A "g%[,,h/Sg7Ab Mr. Thomas M. Novak Assistant Director for Operating Reactors N%

ST{ @g,d Division of Licensing

[

U. S. Nuclear Regulatory Comm.

Washington, D.C.

20555

SUBJECT:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Environmental Qualification of Safety-Related Electrical Equipment (File:

1510.6)

Gentlemen:

Your letter to Mr. William Cavanaugh III dated March 16, 1981 transmitted the NRC staff's preliminary review of environmental qualification of safety-related electrical equipment at Arkansas Nuclear One - Unit 1 (ANO-1).

This letter required, pursuant to 10 CFR 50.54(f), that we review the NRC staff's preliminary list of deficiencies (Appendices B and C to the above referenced letter) and submit a written statement, within 10 days, supporting continued safe operation of ANO-1.

We have restricted our review to the preliminary list of deficiencies, as indicated by your letter. The limited time for response prevented the development of comments relative to the textual portion of the

" Partial Review of Equipment Evaluation by the Office of Nuclear Reactor Regulation." We expect that the positions discussed in the text of this document will appear in the Safety Evaluation Report (SER) presently being prepared by the staff, and we therefore reserve comment pending issuance of the SER.

Our review of the preliminary list of deficiencies indicates the list to be little more than a summary of the data sheets submitted by AP&L on October 31, 1980 in response to IE Bulletin 79-018. We feel that the summation has been carried to e point whera most useful information has been lost. We have, however, reviewed the data os presented, and conclude that this infonnation does not alter our previous tunclucions as discussed in our submittal of October 31, 1980.

810 3 8 00 391>

f MEMBER MnDOLE SOUTH UTIUTIES SYSTEM

Mr. Thomas M. Novak March 26, 1981 We note that since October 31, 1980 we have continued our efforts to obtain additional information relative to this equipment. As indicated in your summary of deficiencies, our initial submittal was incomplete with regard to the manufacturer and model of certain items. This missing information has since been collected and will be incorporated into an update of our October 31, 1980 submittal to be included in our response to the SER which we expect to be issued shortly. Also, recently compiled information relative to equipment location has resulted in some modification of our original component list (some components on the original list have since been determined to be in mild environments).

Based on all information we have obtained to date, including your preliminary list of deficiencies, we conclude that there is reasonable assurance that ANO-1 can continue to be operated in a safe manner and that the license should not be modified or suspended.

Should we obtain further information which leads us to conclude that any of. the subject components are not capable of performing their intended ~

function, you will be promptly informed per the reporting requirements of IE Bulletin 79-01B or the Technical Specifications, as appropriate.

Very truly yours,

M f.c) C ll David C. Trimble Manager, Licensing DCT:DRH:1p Mr. K. V. S'yfrit, Director cc:

e Office of Inspection & Enforcement U. S. Nuclear Regulatory. Comm.

Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 m

i 4

3 i

V STATE OF ARKANSAS

)

) SS COUNTY OF PULASKI

)

I, DAVID C. TRIMBLE, being duly sworn, subscribe to and say that I am the Manager of the Licensing Section, for Arkansas Power & Light Company; that I have full authority to execute this oath; that I have read the foregoing LETTER NO. 1R-0381-09 and know the contents thereof; and that to the best of my knowledge, information and belief the statements made in it are true.

b M f. T DAVID C. TRIMBLE SUBSCRIBED AND SWORN T0 before me, a Notary Public in and for the County and State above named, this dh day of N 8 ( d, 1981.

L W

OLil-JA NOTARY-PUELIC

/

MY COMMISSION EXPIRES:

My Commission Expires 9/1/81

+

x L