ML19350B699

From kanterella
Jump to navigation Jump to search
Forwards Names of Personnel for Reactor Operator License Renewal.B Connor,A Foehner & F Kaminski Have Completed All Aspects of Requalification Program
ML19350B699
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/13/1981
From: Schneider F
Public Service Enterprise Group
To: Collins P
Office of Nuclear Reactor Regulation
References
NUDOCS 8103230401
Download: ML19350B699 (4)


Text

-

.,sL///J Frederick W. Schneeder Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-7373 vica President Production January 13, 1981 Mr. Paul F. Collins U.S. Nuclear Regulatory Commission Operator Licensing Branch Washington, D.C.

20555

Dear Mr. Collins:

LICENSE RENEWALS In accordance with the provisions of Title 10, Part 55, Code of Federal Regulations, I hereby submit the names of those personnel who have need to renew their Reactor Operator License for Salem Unit Nos. 1 and 2.

They have all consistently demonstrated the capabiiity to discharge their license responsibilities in a safe, competent manner and have successfully completed all aspects of the Requalification Program currently in effect:

B. Connor (Unit 1 only)

[p // /6 A. Foehner (Unit 1 only) M S/7 F.

Kaminski, Jr. (Units 1 and 2)

Sincerely yours, Enclosures 8103230/jpl

t 9PSEG Public Service Electric and Gas Company January 6, 1981 Mr. Paul F.

Collins U.S. Nuclear Regulatory Commission Operator Licensing Branch Washington, D.C.

20555

Dear Mr. Collins:

In accordance with the provision of Title 10, Part 55, Ccde of Federal Regulations, I hereby apply for renewal of my Reactor Operator License No.

4898-1 for Salem Units 1 and 2 facilities.

The information required by the regulation is setforth within.

The information supplied is, to the best of my knowledge, accurate and complete.

Respectfully submitted, 7

J hv m v.

Francis Kaminski, Jr.

cnwat c, tot E1 95 5301 1100M13-79

1 i

~

~ (*PSEG Public Service Elecinc and Gas Cornpany P O Box #168 Hancocks Bndge Udw Jersey 08038 EL'LL NAT :

Francis Kaminski, Jr.

ECid.5S:

Rural Rt

  1. 2, Box 4 Woodstown, New Jersey 08098 CITIZD EdIP:

United States AGE:

31 p m T csIcyER:

Public Service Electric & Gas Company POSITION m :

Nuclear Control Ope +. tor mqq;:

High School Graduate PRESEC CR PPEVICCS LICEEE (INC:1.CDU dr:u.,V NO.):

Reactor Operator License No. 4898-1 de n AC F E S :

Salem Units 1 & 2 MEDICAL EGM:2RTICN:

Forwarded directly to the Director of Nuclear Reactor Regulation WCRK h N :

(From date of last license issue)

CATE CE5CRudGi Feb. 1979 - Present As a Control Rocm Operator, I have manipu-lated the ccntrols of No. 1 Unit during the various Modes, as defined in the Technical Specifications; this has included operation at power and two(2) refuelings.

Additionally, I have participated in the Cold Hydro & Startup and Hot Functional testing of No. 2 Unit.

The Energy Pecole 95 218915M) 10 79

NAME:bcis ram 4 mk4

.T v

. TRAINING EXPERIENCE:

(Since license iscue)

DATE DESCRIPTION Oct. 1980 Attended a one week (40 hr.) requalification program at Vepco's Surry Simulator.

This con-sisted of a review of significant LER's, oper-ating experience, and the completion of re-quired reactivity manipulations as per Salem's Licensed Operator Requalification Procedure.

Sep. 1980 Attended a two day (16 hr.) Recognizing /

Mitigating Core Damage course conducted by the training staff.

The course covered those topics outlined in Enclosure 3 of the Mar. 28, 1980 Denton letter.

Oct. 1979 Attended a one week (40 hr.) requalification program at Consolidated Edison's Indian Point Simulator.

Goals and accomplishments comparable to those described in Surry simulator entry above.

Additionally:

1.

Have successfully completed all phases of the Salem Licensed Operator Requalification Program currently in effect.,

2.

Successfully completed the salem Unit 1/2 Differences Course.

3.

Successfully completed the Salem TMI/79-06 Training Course.

4.

Successfully completed the Salem Unit 2 Review Program.