ML19350B385

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-1100/80-10 on 801216-19 & 29-31.No Noncompliance Noted.Major Areas Inspected:Measurement Controls,Internal Controls & Physical Inventory.Rept Withheld (Ref 10CFR2.790)
ML19350B385
Person / Time
Site: 07001100
Issue date: 01/23/1981
From: Cohen I, Dellaratta A, Joyner J, Zibulsky H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19350B382 List:
References
70-1100-80-10, NUDOCS 8103200385
Download: ML19350B385 (1)


Text

.._ __

l U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF If1SPECTION AND ENFORCEMENT REGION I i

Report flo-10-1100/80-10 n

Docket No.

70-1100 Licensa No. _ SUM-1067 Safeguards Group 3

Licensee:

Combustion Engineering, Inc.

j P. O. Box 500 Windsor, Connecticut. 06095 i

Facility flame:

Combustion Engineering - fluclear Fuel Manufacturing i

Inspection At:

Windsor, Connecticut 1

Inspection Conducted:

December 16-19 and 29-31, 1980 l

i-Date of Last Material Control and Accounting Inspection October 10, 1980

-1 Type of Inspectica: ~ Unagnounced, Material Control and Accounting i

Inspectors

//M / p#

I. Cohen, Chemist

' dite W

'ks/p/

A. DellaRatto, Auditor

/ date

~ f7 2'l 1 ds&M wha $4A{

}

H. Zibul'ky,(-Chemist

' date s

l-Approved by:

hva /d

//23/A/

~

av

.1. Joyner, C)f>6T /tuclear Material Control

/ date pport SectiorV, Safeguards Branch.

Inspection Summary:

198,0_(ReportNo. 70-110_,0/80-10)

Inspection on December 16-19 and 29-31;Tternal Control and Physical Inventory Areas Inspected: Measurement Controls,

.The inspection involved.126-inspector-hours on site by three flRC inspectors and was begun-during regular hours.

Resul ts: The licensee was found to'be-in compliance with NRC requirements in

.the areas examined during the' inspection.

810820 )

'RegioniI Form 166

-(August-1979)

---