ML19350B385
| ML19350B385 | |
| Person / Time | |
|---|---|
| Site: | 07001100 |
| Issue date: | 01/23/1981 |
| From: | Cohen I, Dellaratta A, Joyner J, Zibulsky H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19350B382 | List: |
| References | |
| 70-1100-80-10, NUDOCS 8103200385 | |
| Download: ML19350B385 (1) | |
Text
.._ __
l U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF If1SPECTION AND ENFORCEMENT REGION I i
Report flo-10-1100/80-10 n
Docket No.
70-1100 Licensa No. _ SUM-1067 Safeguards Group 3
Licensee:
Combustion Engineering, Inc.
j P. O. Box 500 Windsor, Connecticut. 06095 i
Facility flame:
Combustion Engineering - fluclear Fuel Manufacturing i
Inspection At:
Windsor, Connecticut 1
Inspection Conducted:
December 16-19 and 29-31, 1980 l
i-Date of Last Material Control and Accounting Inspection October 10, 1980
-1 Type of Inspectica: ~ Unagnounced, Material Control and Accounting i
Inspectors
//M / p#
I. Cohen, Chemist
' dite W
'ks/p/
A. DellaRatto, Auditor
/ date
~ f7 2'l 1 ds&M wha $4A{
}
H. Zibul'ky,(-Chemist
' date s
l-Approved by:
hva /d
//23/A/
~
av
.1. Joyner, C)f>6T /tuclear Material Control
/ date pport SectiorV, Safeguards Branch.
Inspection Summary:
198,0_(ReportNo. 70-110_,0/80-10)
Inspection on December 16-19 and 29-31;Tternal Control and Physical Inventory Areas Inspected: Measurement Controls,
.The inspection involved.126-inspector-hours on site by three flRC inspectors and was begun-during regular hours.
Resul ts: The licensee was found to'be-in compliance with NRC requirements in
.the areas examined during the' inspection.
810820 )
'RegioniI Form 166
-(August-1979)
---