ML19350B194
| ML19350B194 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 02/17/1981 |
| From: | Morisi A BOSTON EDISON CO. |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| 81-39, IEB-79-27, NUDOCS 8103200070 | |
| Download: ML19350B194 (1) | |
Text
BOSTON EDIBON COMPANY ormenac omece eco eartstow staccv BO STON, M AS BacMuS ETTE o 219 9 A. V. M o mist MANAccR wucocAn onc=Areous supeear oceAarMcur February 17, 1981 BECo. 1.tr. #81-39 C t '^
Q 7
g/ g Mr. Boyce H. Grier p Eg Office Of Inspection and Enforcement
+
(f.ZR
~
Region I
~
O ISS u.,.Dggn.f % tj U.S. Nuclear Regulatory Commission A
631 Park Avenue King of Prussia, PA 19406 g
Licensef 4
Docket No.
Supplemental Response to IE Bulletin No. 79-27
References:
(a) BECo. letter #80-24, Respo,ise to IE Bulletin No. 79-27
Dear Mr. Grier:
In Reference (a), Boston Edison Company responded to IE Bulletin No. 79-27.
One of the bulletin's required actions was a preparation of emergency procedures and review of existing ones used by operators upon loss on non-class-1-E instru-mentation and control power system bus during operation. The purpose of this letter is to provide BECo's schedule for completing its circuit by circuit eval-uation of the instrument and control buses and for implementing any procedure changes which result'from the evaluation.
Completion of Engineering Evaluation May 1, 1981 Implementation of Resultant Procedure Changes June 1, 1981 Should you have any questions or require any additional infomation, please do not hesitate to contact us.
Very truly yours
/[fi3?;:m15 cc:
- Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Comission Washington D.C.