ML19350B110
| ML19350B110 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 12/15/1980 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19350B104 | List: |
| References | |
| 50-213-80-11, NUDOCS 8103190670 | |
| Download: ML19350B110 (1) | |
Text
_
' Appendix A Notice of Violation Connecticut Yankee Atomic Power Company Docket No. 50-213 Based on the results of an NRC inspection conducted on August 3-22 and September 10-26, 1980, it appears that one of your activities was not conducted in full compliance with conditions of your NRC Facility License No. DPR-61 as indicated below.
This item is an infraction.
Environmental Technical Specification (ETS) 2.4.3.1(1) limits the release rate of noble gases from the site based upo~n the beta and gamma energies of the isotopic mix being released.
Contrary to the above, on September 26, 1980, a noble gas mixture was released which exceeded the ETS 2.4.3.1(1) limit by a factor of 3.38 for a period of approximately three minutes.
i l
i slos190(s7t?
i
. -