ML19350A273
| ML19350A273 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 02/27/1981 |
| From: | Linder F DAIRYLAND POWER COOPERATIVE |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML19350A274 | List: |
| References | |
| LAC-7391, NUDOCS 8103130381 | |
| Download: ML19350A273 (1) | |
Text
D L24h47V2%4/VL1 COOPERAT/VE 9o Box sir 2eis cast AV south. t A CROSSE WI5CoNSIN 960i (008) 788 4000 February 27, 1981 In reply, please refer to LAC-7391 DOCKET NO. 50-409
!&. James G.
Keppler
[
N,
c".
b' U.
S.
Nuclear Regulatory Commission
[
'f To' M, Regional Director
\\"
9 9' j[gCE r L Directorate of Regulatory Operations y>
3 Ch($7(l5 Region III 799 Roosevelt Road E~
O Glen Ellyn, IL 60137
/
/s'
~
%/
//
SUhJECT:
DAIRYLAND POWER COOPERATIVE
.3 BEN..,s LA CROSSE BOILING WATER REACTOR (
PROVISIONAL OPERATING LICENSE NO. DPR-45 ANNUAL REPORT FOR 1980 - REPORT OF CHANGES, TESTS, AND EXPERIMENTS FOR 1980
REFERENCES:
(1)
LACBWR Technical Specifications, Section 3.9.1.b (2) 10 CFR 50.59(b)
(3)
NUREG-0737, dated 10/31/80,Section II.K.3.(3)
Dear fir. Keppler:
In accordance with Reference (1), we are submitting two (2) copics of the Annual Report for 1980 coverirn the radiological exposure summary.
Also, included are brief descriptions of changes and tests including summaries of the safety evaluations of each required by the provisions of Reference (2).
No experiments were conducted during this reporting period.
In accordance with Reference (3), this report also includes the annual report of saf ety valve failures.
There were no safety valve failurcs during 1980.
If there are any questions concerning this report, please contact us.
Very truly yours, DAIRYLAND POWER COOPERATIVE Nta -j $"d '[
Frank Linder, General tanager FL:LSG: abs Enclosures CC:
Director of Inspection & Enforcement (40)
U.
S. Nuclear Regulatory Commission Washington, D. c.
20555 810818025%1 d