ML19350A176
| ML19350A176 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 10/31/1977 |
| From: | Switzer D CONNECTICUT YANKEE ATOMIC POWER CO. |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| IEB-77-02, IEB-77-2, NUDOCS 8102180811 | |
| Download: ML19350A176 (1) | |
Text
____________________________________________________________(
L, c4xnnt 1%.Es C CONNECThUT h WER COMPANY YANKEE ATOMIC i
BERLIN. CO N N EC TIC U T P. O 90X 270 H A RTFORD. CON N ECTICUT 06101 203StS 9 11 October 31, 1977 Docket No. 50-213 l
U. S. Nuclear Regulatory Comission Region 1 Office of Inspection & Enforcement 631 Park Avenue King of Prussia, PA 19406 Attention: Mr. Boyce H. Grier, Director
Dear Mr. Grier:
Re:
Inspection & Enforcement Bulletin 77-02 Westinghouse NSD Technical Bulletin No. 77-10 (U. S. NRC I&E Bulletin 77-02) addresses increased failures of AR relays with latch attachments.
We do not have this type of relay at Connecticut Yankee; therefore, we do not need to be concerned with the suggested modification.
Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY D. C. Switzer President DCS:RPT/kwc cc: Office of Inspection By:
and Enforcement W.p.Greten Washington, DC Vice-President W6 t/serl/
.