AO 50-29/75-09:on 750906,fuse Blew in Emergency Diesel Generator Dc Starting Circuit.Caused by Overheating & Subsequent Fusing of Starting Circuit Supervisory Lamp. Ten-day Rept Forthcoming
ML19350A161
Person / Time
Site: Yankee Rowe
Issue date: 09/08/1975
From: Autio H
YANKEE ATOMIC ELECTRIC CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
AO-50-29-75-09, AO-50-29-75-9, NUDOCS 8102120091
Download: ML19350A161 (1)


Text

(-

[

YAlll[EE ATOUIC ELECil?IC COUPAllY iOM&+

k Rowe, Massachusetts 01367 Q?'

f

,Ya"[ massy tz g vp ;-:'

September 8, 1975 iQ s V

\\, =\\ '

b,>lp

~

e i 4 *, ~,. v 4

O United States Nuclear Regulatory Commission Office of Inspection & Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention: Mr. James P. O'Reilly, Director

Dear Mr. O'Reilly:

Pursuant to the requirements of the Technical Specifications Section E.4.d, a failure of an engineered safety feature that causes or threatens to ceuse the feature or system to be incapable of performing its intended function is reported as Abnormal Occurrence 50-29/75-09.

At 0720 on 9/6/75, with the plant ooerating at normal steady state power, a blown fuse in the'No.1 Emergency Diesel Generator DC starting circuit resulted from the overheating and subsequent fusing of a starting circuit supervisory lamp.

Immediately after the incident the No. 2 and Mc. 3 Emergency Diesel Generators were started and test run for five minutes thus veri-fying their operability.

At 1006 the same day a repair was completed and the No.1 Emergency Diesel Generator was test run and declared fully operational.

l A formal 10 day report will follow.

Very truly yours,

l

.Ydf hs 0v6 l

Herbert A. Autio Plant Superintendent NNS/jb cc: (2) Director, Office of MIPC U.S. Nuclear Regulatory Commission Washington, D. C. 20545 l

9/09/90 D9/

~

Ii a

YACHEE ATCDia ELECTDES CCDPAUV WlUk Rowe,Mmm-husetts 0139 Y/N'eKiSE

~

September 8.1975 United States-Nuclear Regulatory Cocs:rission Office of Inspection a Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention:

Mr. Jaces P. O'Reilly. Director

Dear Mr. O'Reilly:

. Pursuant to the requirecents of the Technical Specifications Section E.4.d, a failuru of an engineered safety feature that causes or threatens to cause the feature or system to be incapable of perforcing its intended functiorr is reported as Abnorte,a1 Occurrence 53-29/75-09.

At 0720 on 9/S/75, with the plant operating at norr.31 steady state. power, a blorn fuse in the No.1 Erercency Diesel Generator DC starting circuit resulted from the overheating and subsequent fring of a starting circuit supervisory lanp.

Icrediately after the incident the No. 2 and No. 3 Er.nrgency Diesel Generatcis ware started and test run for five minutes thus veri-fying their operability.

At 1005 the same day a repair was co~pleted and the No.1 Emergency Diesel Generator was test run and. declared fully cperational.

i A formal 10 day report wi1T fo1 Tow.

Very truly yours, I

fh

~

o Herbert A. Autio Plant Superintendent NNS/jb cc- (2)

Director. Office of HIPC U.S. Nuclear Regulatory Cocmissiorr Washington, D. C. 20545 I

110RIRoo W c

w - -

.,.v-m.-..

- - -.-~,

w yr-

,.,,y+

,-.w-,

, +,.

,,