Responds to IE Bulletin 80-19 Failures of Mercury-Wetted Matrix Relays in Reactor Protective Sys of Operating Nuclear Power Plant Designed by C-E. Surveillance Testing Has Been Increased.Relays Will Be Replaced on as-failed Basis
ML19350A069
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/30/1980
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-80-19, NUDOCS 8012010368
Download: ML19350A069 (1)


Text

{{#Wiki_filter:,I l. se M B ALTI MORE G AS AN D ELECTRIC C.O.M P ANY P.O. BO X 147 5 -{ 3 }; S ALTIM O R E. M A R YL AN D 21203 ' 'N ~_ T Antwum E. LUNOVALL.JR. h [j v.a......... Sv nt a October 30, 1980 U.S. Nuclear Regulatory Commission Docket Nos. 50-317 Region I 50-318 631 Park Avenue King of Prussia, PA 19406 ATTN: Mr. Boyce H. Grier, Director Gentlemen: This letter is in reference to IE Bulletin 80-19, " Failures of Mercury-Wetted Matrix Relays in Reactor Protective Systems of Operating Nuclear Power Plants Designed by Combustion Engineering". In accordance with licensee action paragraph two, surveillance testing of C. P. Clare Itdel HG2X-1011 mercury-wetted relays installed in both Calvert Cliffs units' Reactor Protective Systems has been increased to the prescribed frequency. It is anticipated that a qualified dry-contact relay will be available in a direct replacement configuration by early 1981. When available, replacement relays will be purchased. It is our intention to replace the mercury-wetted relays on an "as failed" basis, following the recommendatior -" "mbustion Engineering, Incorporated. Until a new replacement er. .s available, the presently installed relays will be replaced in k1 tid. Should you have any further questions regarding this matter, we would be pleased to discuss them with you. Very truly!yods,) u c =Juw p! A. E. und all, Jr. / Vice President-Supply AEL/PGR/gla 801201036& Q .}}