ML19347F904

From kanterella
Jump to navigation Jump to search
Ltr Contract NRC-05-81-249, Support for Region 1 Independent Measurements (Nde), Awarded to Nbs
ML19347F904
Person / Time
Issue date: 02/12/1981
From: Morton K
NRC OFFICE OF ADMINISTRATION (ADM)
To: Eitzen D
NATIONAL INSTITUTE OF STANDARDS & TECHNOLOGY (FORMERL
Shared Package
ML19347F903 List:
References
CON-FIN-B-1273, CON-NRC-05-81-249, CON-NRC-5-81-249 NUDOCS 8105260570
Download: ML19347F904 (4)


Text

,e f)

-f

'c, UNITED CTATEs

[ f s y }' i NUCLEAR REGULATORY COMMISSION

,.,. g C

WASHINGTON. D 0. 0055=

s '%ft j

gv p m 1. 01 U. S. Department of Comerce National Bureau of Standards Center for Manufacturing Engineering ATTN: Mr. Don Eitzen Ultrasonics Standards Group Washington, DC 20234 Gentlemen:

Subject:

Interagency Agreement No. NRC-05-81-249 Pursuant to the authority of-the Economy (Act of 1932, as amanded, 31 U.S.C. 586, the U. S. Nuclear Regulatory Commission NRC) desires to enter into an agreement whereby the National Bureau of Standards (NBS) will provide calibration for ultrasonic test instruments and ultrasonic test transducers used by NRC regional offices for independent nondestructive (NDE) measurements at licensee facilities.

Accordingly, the parties hereto mutually agree to the following terms of this agreement:

I.

Scope of Work The NBS shall perform the specific work as expressed in the attached " Scope of Work" (Attachment A).

II. period of Performance s.

The period of performance is March 1, 1981 through December 31, 1982.

III. Reports A report of work performed, any deviations of equipment accuracy, and statement of equipment calibration status shall be provided after each calibration'and delivered at tM  : af(' equipment pfck-up. k ' g },.

Z w cA.oM M[f,/!/

IV. Estimate of Cost and Obligation of Funds g

gg Q, gfq, y

A.

The estimated cost of the work to be performed under this agreement the first year is $11,500.00.

B.

The amount presently obligated for the performance of work under this agreement is $11,500.0.0.,

C.

NRC Accounting Data:

Appropriation No. 31X200.301-B&R No.:

30-19-01-02 FIN N0.:

81273 3105260570

2 V.

Payment 1.

The NRC shall rt e der payment to NBS in approximately thirty (30) day; after submission of proper and correct vouchers rendered after each calibration.

2.

The NBS should address the original voucher (Standard Form 1081) with three copies to:

U. S. Nuclear R llatory Commission Office of the Conirclier ATTN: Director, Division of Accounting Washington, DC 20555 VI. NRC Contacts Authorized Technical Representative Mr. Wolfgang Laudan Office of Inspection and Enforcement, Headquarters (301) 492-7551 Mr. Lowell E. Tripp Office of Inspection and Enforcement, Region I (215) 488-1282 Contrach

~

~

Mr. Levi Baisden-Division of Contracts (301) 427-4365 VII. NBS Contacts Technical y

Mr. Don Eitzen Ultrasonics-Standards Group

-(301) 921-3646 Financial Mr. R. J. Dominic Office of Controller (301) 921-2297 l

s l

3 If :his agreement is acceptable, please have three (3) copies executed and returned to 3.

The fourth copy is to _be retained for your records.

S1acerely, e

i n

h '.

4 W -

Kellogg}V Morton, Chief Research Contracts Branch Division of Contracts Office of Administration

Enclosures:

As stated ACCEPTED:

NATIONAL BUREAU OF STANDARDS U. S. DEPARTMENT OF COMMERCE BY:

W\\

TITLE:

Acting Chief, Mechanical Production Metrology Division DATE:

3/18/81

~

~

-f t

8 D

ATTACH' tit ;

SCOPE OF WORK _

-1.

National Bureau of Standards (NBS) shall provide calibration for the following -

Nuclear Regulatory Commission (NRC) os;ned equipment:

Two (2) Ultrasonic Test Instruments Ten (10) Ultrasonic Test Transducers 2.

The ultrasonic test instruments shall be caifbrated two times a year. The estimated calibration cost per year for these instruments is $8,000.00.

(2 instruments a $2,000.00 ea x 2 calibrations ea.= $8,000.00).

3.

The ultrasonic test transducers shall be calibrated once a year.

The estimated calibration cost per year for these transducers is $3,500.00.

(10 transddcers at'$350:00 ea x 1 calibration ea = $3,500.00).

4.

The equipment specified above shall be hand delivered to NBS facilities at the Ultrasonics Standards Group, Building A-147, Interstate 270 and Quince Orchard Road, Gaithersburg, Maryland.

5.

The duration time for each calibration shall be one (1) wca.

Representatives from NRC, Region I Office will pick-up the equipment at NBS facilities after each calibration.

b d

l 9

6 4

e v

_ _ _ -