ML19347F697

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Rept 50-267/81-03.Corrective Actions:Modified Liquid Waste Release Discharge Path & Installed Bypass Around Oil Separator
ML19347F697
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 04/14/1981
From: Lee O
PUBLIC SERVICE CO. OF COLORADO
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19347F694 List:
References
P-81122, NUDOCS 8105260066
Download: ML19347F697 (2)


Text

k N

i a4 J

PUBLIC SERVICE COMPANY OF COLORADO P. O.

SOX 840 DENVER, COLORADO 80200 OSCAR R. LEE April 14, 1981 vicz narsioce r Fort _St. Vrain Unit No. 1 P-81122 Mr. Glen L. Madsen, Chief Reactor Operations and Nuclear Support Branch Nuclear Regulatory Commission Region IV, Regulatory Operations P.O. Box 5039 Arlington, Texas 76012 Docket No.

50-267

Reference:

I&E Inspection 81-03

Dear Mr. Madsen,

This letter is in response to the Notice of Violation received as a result of inspections conducted at this facility during the period February 1 to February 28, 1981.

Numbering is consistent with that in the Notice of Violation.

1. (a) Liquid waste releases were immediately suspended until the discharge path was modified, preventing further violations.

(b) A by-pass was installed around the oil separator, to be used for liquid releases, and procedures revised to provide for a flush of the system with clean water at the release rate, on completion of i

the release.

Releases subsequent to these modifications have all shown the modifications to be effective.

(c) We are now in compliance.

l

2. (a) All personnel involved, including the working foreman, have been reprimanded for their failure to properly exit an R.W.P. area.

(b) Working Foremen and Supervisors have been instructed to emphasize RWP requirements in j ob briefings prior to job commencement and j

to continue such briefings throughout the job.

(c) We are now in compliance.

Very Truly Yours,

~

l.'

0. R. Lee Vice President ORL/sk 8105260 M

Eg STATE OF COLORADO

)_

)

ss.

CITY AND COUNTY OF DENVER)

O. R. Lee, being first duly sworn, deposes and says; That he is Vice President of Production of Public Service Company of Colorado, the Licensee herein; that he has read the f oregoing Application for Amendment to Appendix A of Facility Operating License and knows the contents thereof, and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

fl.Yic' O. R. Lee l

Subscribed and sworn to before me this 22'Y ay of April,1981.

d Witness my hand and official seal.

3 My commission expires:

b CT 3 50' 7 l'78 3

'e a

(,~

i 1

i L.

(,

. w...,

Notary Public

/

i l

I-

[

-