Responds to NRC 801222 Ltr Requesting Review of Controls for Handling of Heavy Loads.Lists Interim Actions Applied to Meet Requirements
ML19347F575
Person / Time
Site: Zimmer
Issue date: 05/13/1981
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8105200147
Download: ML19347F575 (2)


Text

- - _ _ .

I THE CINC. .NATI GAS & ELECTRIC C . s CINCINN AT8, OHIO 4520t os yf k

  • E. A. BOROMAN N
w. o. v.a ms ow -

@ post J Docket No. 50-358 May 13, 1981

% i j [~

Pr. liarold Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 RE: WM. H. ZIMMER NUCLEAR POWER STATION -

UNIT 1 - CONTROL E HEAVY LOADS

Dear Mr. Denton:

On January 12, 1981, an NRC letter dated December 22, 1980 from Mr. Darrell G. Eisenhut was received. The purpose of that letter was to request that CG&E review its controls for the handling of heavy loads to determine the extent to which the guidelines of Enclosure 1 to that letter are presently satisfied at the Zimmer Plant, and to identify the changes in modifications that would be required in order to fully satisfy those guidelines.

Enclosure 2 of the NRC letter lists a series of interim actions to be applied for the control of heavy loads. These interim actions are being met ss follows:

1) Equipment removal paths have been defined by our architect engineers and shown on equipment layout drawings. Movements over the reactor vessel, spent fuel pool or safe shutdown equipment is limited to the maximum extent possible.
2) Procedures are being developed to control the handling of heavy loads over or in the proximity to irradiated fuel or safe shutdown equipment. The administrative controls exercised, require specific implementing procedures for the handling of heavy loads over or in close proximity to irradiated fuel on the plant refueling floor. These implementing procedures shall include: identification of required equipment, inspections required before load move-ment, and the handling sequence to be followed including the equipment removal path. These procedures shall be reviewed and approved prior to initial fuel loading.

The movement of heavy loads, other than on the refueling floor, shall be under the control of the maintenance supervisor. The appropriate precautions and equipment removal pat.h shall be defined on the plant work request 810s200/47 I

__ . - ~ - , ,. - __ ,_ .

~

D r ..

l To t . Mr. Harold Denton, Dir'ector May113,J1981 Re ~,Wm.'H. Zimmer Nuclear Power Station'-

~

Page.#2 Unit'l - Control of Heavy Loads

for those load handling devices previously iden'ified. t as having potential-for damage to safe shutdownjequipment.
3) All personnel who operate cranes or hoists'at the.Wm.'H.

Zimmer Nuclear Power Station.have received' documented classroom training in the areas of rigging, conduct of-hoisting operations, use of-handsignals and rigging inspection.

O In addition, personnel have experience in the use of the

cab-operated reactor building crane from the construction j and pre-operational testing period of the plant.

1

4) All. cranes and. hoists at the Wm. H. Zimmer Nuclear Power a Station, which are under control of the Llectric Production Department. are periodically inspected as required by ANSI
i. B.so.2.0.- Cranes are designated as either regular or

! standby service, by, applying a more than a twice a week-1 usage criteria.

All cranes undergo an undocumented before use inLpection,

and a yearly documented inspection. All regular.use cranes

! or standby use cranes being operated regularly for more than a month, undergo a documented monthly inspection.

Very truly yours, l THE CINCINNATI GAS & ELECTRIC COMPANY-I I

By

! E. A. BORGMANN EAB: dew cc: Charles Bechhoefer George E. Pattison M. Stanley Livingston Andrew B. Dennison  ;

Frank F. Hoooer Troy B. Conner, Jr. State of Ohio )

County of Hamilton),,

James P. Fenstermaker ,

Steven G. Smith Sworn t and subscribed before  ;

William J. Moran me this /3 day of May, 1981.

J. Robert Newlin William G. Porter, Jr.

James D. Flynn -

F. T. Daniels 4pf

, W. Peter Heile Notary Public j James H. Feldman, Jr. (

t John'D. Woliver ~

Mary Reder MARGARET L'HUBER 3,,,,,, g;,,, 31,,, g, g,,,

David K. Martin pay comm;gg3 gig, gy,, 33, 3,p i

I - -