05000338/LER-1981-027-03, /03L-0:on 810404,while in Mode 1,emergency Diesel Generator 1J Was Declared Inoperable.Caused by Oil Leak on Diesel Engine.Gasket Was Replaced & Engine Operated for 4-h to Vaporize Residual Oil

From kanterella
(Redirected from ML19347F436)
Jump to navigation Jump to search
/03L-0:on 810404,while in Mode 1,emergency Diesel Generator 1J Was Declared Inoperable.Caused by Oil Leak on Diesel Engine.Gasket Was Replaced & Engine Operated for 4-h to Vaporize Residual Oil
ML19347F436
Person / Time
Site: North Anna Dominion icon.png
Issue date: 05/13/1981
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19347F432 List:
References
LER-81-027-03L, LER-81-27-3L, NUDOCS 8105190270
Download: ML19347F436 (2)


LER-1981-027, /03L-0:on 810404,while in Mode 1,emergency Diesel Generator 1J Was Declared Inoperable.Caused by Oil Leak on Diesel Engine.Gasket Was Replaced & Engine Operated for 4-h to Vaporize Residual Oil
Event date:
Report date:
3381981027R03 - NRC Website

text

.

~,

U.S. NUCLEAR REGULATORY COMMISSION

)

LICENSEE EVENT REPORT CONTROL BLOCK / / / / / / / (1)

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

/0/1/

/V/A/N/A/S/1/ (2)

/0/0/-/0/0/0/0/0/-/0/0/ (3)

/4/1/1/1/1/ (4)

/ / / (5)

LICENSEE CODE LICENSE NUMBER LICENSE TYPE CAT bL/ (6)

/0/5/0/0/0/3/3/8/ (7)

/0/4/2/1/8/1/ (8) /o /s /1/3 /t /1/ (9)

E DOCKET NUMBER EVENT DATE REPORT DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES (10)

/0/2/

/

On April 4, 1981, while in Mode 1, emergency diesel generator IJ developed an /

/0/3/

/

oil leak and was declared inoperable. The remaining A.C. power sources were

/

/0/4/

/

verified within one hour and every subsequent 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> as required by T.S.

/

/0/5/

/

3.8.1.1.

Therefore, the health and safety of the public were not affected.

/

/0/6/

/

This item is reportable purusant to T.S. 6.9.1.9.b.

/

/0/7/

/

/

/0/8/

/

/

SYSTEM

CAUSE

CAUSE COMP.

VALVE CODE CODE SUBCODE C0hPONENT CODE SUBCODE SUBCODE

/0/9/

/E/E/ (11) g/ (12) /B/ (13) /E/N/G/I/N/E/ (14) /X/ (IS) g/ (16)

SEQUENTIAL OCCURRENCE REPORT REVISION LER/R0 EVENT YEAR REPORT NO.

CODE TYPE NO.

(17) REPORT NUMBER

/8/1/

[-/ /0/2/7/

/\\/

/0/3/

g/

/-/

[0/

ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRD-4 PRIME COMP. COMPONENT TAKEN ACTION ON PLANT METHOD HOURS SUBMITTED FORM SUB. SUPPLIER MANUFACTURER g/ (18) /Z/ (19) /B/ (20) g/ (21) /0/0/0/0/ (22) g/ (23) /N/ (24) /A/ (25) /C/4/7/0/ (26)

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS (27)

/1/0/

/

This event was caused by an oil leak on the diesel engine. A gasket was

/

/1/1/

/

replaced and the engine operated for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to vaporize any oil remaining in /

/1/2/

/

the exhaust port as per the manufacturer's recommendation.

/

l

/1/3/

/

/

/1/4/

/

/

FACILITY METHOD OF STATUS

% POWER OTHER STATUS

/1/5/

g/ (28)

/1/0/0/ (29) /

NA

/( } DISCOVERY DISCOVERY DESCRIPTION (32) g/ (31)

/

OBSERVATION

/

ACTIVITY CONTEh~r RELEASED OF RELEASE AMOUNT OF ACTIVITY (35)

LOCATION OF RELEASE (36) l

/1/6/

/Z/ (33)

/Z/ (34) /

NA

/

/

NA

/

PERSONNEL EXPOSURES l

NUMBER TYPE DESCRIPTION (39) l

/1/7/ /0/0/0/ (37) LZL (38) /

NA

/

PERSONNEL INJURIES NVIBER DESCRIPTION (41)

/1/8/ /0/0/0/ (40) /

NA

/

LOSS OF OR DAMAGE TO FACILITY (43)

TYPE

DESCRIPTION

/1/9/

LZL (42) /

NA

/

PUBLICITY ISSUED DESCRIPTION (45)

NRC USE ONLY L2/0/

gL (44) /

NA

/////////////

NAME OF PREPARER W. R. CARTWRIGHT PHONE (703) 894-5151 8105190 2 70

Virginia Electric and Power Company North Anna Power Ststion, Unit #1 Attachment: Page 1 of 1 Docket No. 50-338 Report No. LER 81-027/03L-0

Description of Event

On April 21, 1981, the emergency diesel generator 1J developed an oil leak. The oil leak was in the area of the exhaust manifold which created a small fire. The diesel generator was declared inoperable in order to repair the oil leak and repair any fire damage.

Probable Consequences of Occurrence The redundant diesel generator and off-site power sources were verified operable in accordance with the action required by T.S. 3.8.1.1.

Therefore, there was no effect on the health or safety of the public.

Cause of Event

The manufacturer was contacted to determine the cause of the oil leak and recommended corrective acticas. The occumulation of lubrication oil in the exhaus'. ports, due to an J.nsufficient run time to vaporize the oil, caused excessive build-up in the turbocharger region. When the engine was restarted, this accumulation ignited causing a small fire.

Immediate Corrective Action

The fire was extinguished and the engine declared inoperable. A gasket that initially allowed the excessive oil to run onto the exterior l

of the exhaust manifold was replaced. The generator was operated fully l

loaded for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to vaporize any remaining oil in accordance with l

instructions from the manufacturer's representative.

Scheduled Corrective Action l

l No further corrective action is necessary.

Actions Taken to Prevent Recurrence 1

l In order to prevent recurrence, the diesel generator will be operated for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> with at least 75% load whenever the diesel generator is started.

However, if the diesel is started for an operability check every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 3 l

l the 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded operation will occur every other 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> check. This l

procedure should prevent an excessive accumulation of prelubrication oil.

l Generic Implications This event is generic to all North Anna Unit I and 2 emergency diesel generators. Therefore, the 2 hcur loading requirement will apply to each generator.