Notification of Postponed 810511-15 Meeting W/Util in Monroe,Mi for Fire Protection & OL Application Reviews. Meeting Originally Scheduled for 810504-08.Agenda Encl
ML19347F240
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/28/1981
From: Kintner L
Office of Nuclear Reactor Regulation
To: Youngblood B
Office of Nuclear Reactor Regulation
References
NUDOCS 8105180038
Download: ML19347F240 (5)


Text

c>,

pa aso,,),

u UNITED STATES

+

8

,, (

i NUCLEAR REGULATORY COMMISSION wasmuorow. o. c. rossa o

/

kDR 2 6 pggg Docket No.:

50-341 MEMORANDUM FOR:

B. J. Youngblood, Chief, Licensing Branch No.1, DL FRDM:

L. L. Kintnre, Project Manager, Licensing Branch No.1, DL

SUBJECT:

MEETING WITH DETROIT EDISON REGARDING THE REVIEW OF THE FERMI 2 APPLICATION FOR AN OPERATING LICENSE ll li DATE AND TIME:

Mayf-May/,1981 9 00 AM LOCATION:

Fermi 2 Plant Monroe, Michigan PURPOSE:

To conduct fire protection review (see attached agenda)

PARTICIPANTS:

Detroit Edison Comoany J. Honkala, L. Schuerman, W. Colbe W. Fahrner NRC Staff L. M R. Anand, ". "Mr +-% A. Saeed, J. Beam (Gage Babcock)

L.

. Kintner, Project Manager Licensing Branch No. 1 Division of Licensing

Enclosure:

As stated cc: See next page l a-tt.

CAange-f8105180MS

~.

Mr. Parry Tauber Vice President Engineering & Construction Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 cc:

Eugene B. Thomas. Jr., Esq.

David E. Howell, Esq.

LeBoeuf, Lamb, i.eiby & MacRae 21916 John R 1333 New Hampshire Avenue, N. W.

Hazel Park, Michigan 48030 Washington, D. C.

20036 Mr. Bruce Little Peter A. Marquardt, Esq.

U. S. Nuclear Regulatory Commission Co-Counsel Resident Inspector's Office The Detroit Edison Company 6450 W. Dixie Highway 2000 Second Avenue Newport, Michigan 48166 Detroit, Michigan 48226 Dr. Wayne Jens Mr. William J. Fahrner Detroit Edison Company Project Manager - Fermi 2 2000 Second Avenue The Detroit Edison Co.apany Detroit, Michigan 48226 2000 Second Avenue Detroit, Michigan 48226 Mr. Larry E. Schuerman Detroit Edison. Company 3331 West Big Beaver Road Troy, Michigan 48084

.o AGENDA FOR SITE VISIT - FIRE PROTECTION (FERMI 2)

ntroduction.by NRC a.

Purpose of Visit b.

Method of St.te Review -(Comparison with 10 CFR 50 Appendix A, GDC 3 and 2.

Comments by Licensee a.

Any restrictions 5.

Brief description of plant layout c.

Description of cable design and cable tray identification d.

Special tests of fire retarding materials or construction to verify protection ratings e.

Discussion of initial questions 3.

Plant Review a.

Examine each of the following safety-related areas:

(1) Control Room / Computer Room (2) Cable Spreading Room (3) Battery Rooms (4) Diesel Generator Rooms (5) Switchgear Rooms (6) Relay Rocms (7) Safety-Related Pump Areas (including Residual Heat Removal Complex)

(3) Reactor Building (where accessible) b.

Examine other areas / hazards, includi5g:

(1) Turbine lubrication and control oil storege and use areas (2) Diesel Fuel / Auxiliary Boiler Fuel Oil Storage Tanks (3) Radwaste Area (4) Decontamination Area (5) Records Storage Area (6) Auxiliary Boiler Area (7) Fire Pump Areas (S) Oil Filled Transformers (Indoor and Outdoor)

(9) Hydrogen - Storage, use, and processing areas i

~

c.

As applicable, the above areas will be examined for:

(1) General conditions, congestion, and accessibility (2) Separation between redundant trays and conduits (3) Barriers and fire stops (4)

Fire detection and suppression equipment (5) Ventilation Systems and controls (6) Floor drains (7) Communications equipment (8) Lighting (9) Combustible materials (10) Equipment protectian from water damage (11) Ability to contain fire, or isolate from external fire (12) Means for containing oil spills (13) Means for datecting hydrogen accumulation or loss of ventilation (battery rooms) 4.

Alternate Shutdown Capability 5.

Administrative Controls Discuss:

a.

Fire Protection Organization b.

Fire Hazard Control c.

Control of Ignition Sources d.

Fire Brigade Organization and Training e.

Plant Personnel Indoctrination f.

Fire Fighting Plans g.

Quality Assurance for Fire Protection h.

Contrcis over Fire Protection Systems

i. Lighting and Communication

5

..g Mk6tKJt.md -

MEETING NOT_ ICE DISTRIBUTION APR 3 01981 g

J. Stolz flRC PDR S. Hanauer Local POR P. Collins TIC

0. Vassallo I

'q.Nn.

NSIC

0. Ziemann f

3 9,d Branch File T. Murley N. Hughes F. Schroeder,

,k

-9 E. Case K. Kniel D. Eisenhut D. Skovholt y AIAId5Jcgg

'l o

f.

r t

.P S. Varga R. Baer

'@D T. Ippolito E. Adensam R. A. Clark A. Thadani

.l 4

R. Reid ACRS (16)

R. Tedesco Attorney, GELD J. Youngblood OIE (3)

A. Schwencer 050 (7)

F. Miraglia Project fianager L. Kintner J. R. Miller Licensing Assistant ti. Ruspb_ rook G. Lainas Receptionist D. Crutchfield TERA W. Russell J. LeDoux, I&E J. Olshinki V. Moore R. Vollmer I&E Headquarters R. Bosnak I&E Region I F. Schauer I&E Region II R. E. Jackson I&E Region III G. Lear I&E Regioi. IV V. Noonan I&E Region V S. Pawlicki V. Benaroya NRC

Participants:

Z. Rosztoczy W. Haass R. Anand O. Muller L. Kintner R. Ballard A. Saeed W. Regan J. Beam (Gage Babcock)

J. D. Saltzman D. Ross P. Check Chief, Power Systems Branch

0. Parr bcc: Applicant & Service List F. Rosa W. Butler W. Kreger R. W. Hous ton Chief. Radiological Assessment Branch u

tein D

T. Speis W. Johnston artz

^

r. Pagano S. Ramos J. Kramer