Text
.
9 I\\
{-)
h('
a Metropolitan Edison Company l
f g
Post Office Box 483
,nI[tY ], <j Jggj g Q Middletown, Pennsylvan 4 17057 U.s. Macue m
,y, wnter's o. rect o..i Nurnw C
~ = - -
h~.
Q hud/
May 12, 1981 d !W LL2-81-0123
_E.
g.
.O d=
E TMI Program Office W
-< E Attn:
Mr. Lake Barrett, Deputy Director h
p U. S. Nuclear Regulatory Coc: mission d
e c/o Three Mile Island Nuclear Station 5
i Middletown, Pennsylvania 17057 G
3
\\;.
Dear Sir:
Three Mile Island Nuclear Station, Unit 2 (TMI-2)
Operating License No. DPR-73 Docket No. 50-320 Submerged Demineralizer System In our letter to you, LL2-61-0101, dated April 24, 1981, we provided to you our minimum staffing requirements for the operation of SDS.
The purpose of this letter is to provide you with our anticipated staffing level during operation of SDS, in excess of what we believe to be adequate minimum staffing. Therefore, this let.ter supplements our previous letter.
During initial SDS operations, we perceive a need to provide staffing in excess of the minimum staffing level. This additional staffing will be made up of operations personnel and engineering personnel. One additional operations person will be available to provide direct super-vision for the operation of both SDS and EPICOR-II. He will be trained in the operation of both systems. He will be either a certified Control Room Operator or a Radwaste Foreman.
Because he has the responsibility for operational suparvision of both systems (SDS and EPICOR-II) he may be at either location during the period of time that he is on shift.
He may also, from time to time, be required in the TMI-2 Control Room for discussion with the Shift Foreman and TMI-2 operators.
Additional engineering personnel will be assigned for initial SDS operatier.s. These additional personnel include Recovery Engineering personnel (design organization), Plant Engineering personnel (operations engineering), Process Support Engineering personnel (process control engit ering) and Radiological Controls Engineering personnel (health physics engineering).
It has been deemed appropriate that we supplement our minimum staffing for initial SDS operations with the above mentioned dedicated personnel to assure that not only adequate operations personnel are available fo: SDS operations, but that adequate engineering support personnel are available to characterize the process flow stream, As experience is gained with SDS operations, these support personnel can take on additional duties (other than SDS operations). However, these personnel, in addition to other personnel in the organization, will be available to support SDS operations, if required.
1 fl h
Ms: c: ttan Ed: son Company is a Memoer et the Gers a PLouc Ut+ ties Syste-41D
'8005150 M
.~..
Mr. Lake Barrett LL2-81-0128 We pelieve that this submittal accurately reflects our planned staffing 4
level for SDS operations.
Should you wish to df.scuss this matter further, please contact either myself or Mr. L. J. Lehman, Jr. of my staff.
Sincerely, i
h*-
[
l
. K. Hovey Vice-President and Director, TMI-2 GKIItLJL:djb cc:
Dr. B._J. Snyder, Program Director, TMI Program Office 1