ML19347E793
| ML19347E793 | |
| Person / Time | |
|---|---|
| Site: | 07001201 |
| Issue date: | 05/04/1981 |
| From: | Auerback M, Earnestine Clay, Mcalpine E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | |
| Shared Package | |
| ML19347E790 | List: |
| References | |
| 70-1201-81-01, 70-1201-81-1, NUDOCS 8105130403 | |
| Download: ML19347E793 (1) | |
Text
/
MATERIALTRANSMITTED HGEWTTH
- a at:
CONTAlHS 2.E0 INFORMATION.
f
'o,,
UNITED STATES NUCLEAR REGULATORY COMMISSION e
n m
g
., e REGION 11 8
101 MARIETTA ST., N.W.. SUITE 3100 g
ATLAN1 A, GEORGIA 30303 s
MAY 041981
' Report No. 70-1201/81-01 Docket No. 70-1201 License No. SNM-1168 Safeguards Group III Licensee:
Babcock and Wilcox Company Commercial Nuclear Fuel Plant P. O. Box 800 Lynchburg, VA 24505 Facility Name: B&W CNFP Inspection at:
Lynchburg, Virginia Inspection Conducted:
February 17-19 and March 1-9, 1981 Date of Last Materials Control and Accounting Visit: August 19-21, 1980 Type of Inspection: Announced Material Control and Accounting Inspectors:
ED *h 5'/t+ /8(
fA. L. CLlay, Safe %uards Engineer Date Signed Orwoh s/v /ri
- h. E. Aberback, Auditor, MC&A, HQ Date Signed Approved by: @
5/9 /2 /
E. J. McAlpine, Shction Chief, Date Signed Technical Inspection Branch Division of Engineering and Technical Inspection Inspection summary Area Inspected:
Physical Inventory Verification The inspection involved 92 inspector hours on site by two NRC inspectors.
The inspection was begun during the regular hours.
Results: The licenseb was found to be in compliance with NRC requirements in all areas examined during the inspection.
l l
S-F2 91 l
Copy of
_ Copies l
8105180 N
'l Pases l
This Docu=ent is not to be MATalAtTRt.NSMITTED !!EEWiTH
((,d][,77[11"* "E CONTAINS 2.E0 IHF0. ULT 10N
.