ML19347E540

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-1151/81-03,on 810317-19.No Noncompliance Noted.Major Areas Inspected:Facility Operation & Storage & Internal Control.Details Withheld (Ref 10CFR2.790)
ML19347E540
Person / Time
Site: Westinghouse
Issue date: 05/05/1981
From: Mcalpine E, Todd G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19347E538 List:
References
70-1151-81-03, 70-1151-81-3, NUDOCS 8105120580
Download: ML19347E540 (1)


Text

WTUM1.T"MSWTTED HEREMIN CONTAINS 2hDIMORMATIOR o,,

UNITED STATES NUCLEAR REGULATORY COMMISSION

(

)

c.

' d' E

REGION 11

%,**...o'['

101 MARIETTA ST N.W.. SUITE 3100 ATLANTA, GEORGIA 30303 s

MAY 0 61981 Report No. 70-1151/81-03 Docket No. 70-1151 License No. SNM-1107 Safeguards Group:

III Licensee: Westinghouse Electric Corporation Nuclear Fuel Division Drawer R Columbia, SC 29250 Inspection Conducted. March 17-19, 1981 Date of Last Material Control & Accounting Inspection Visit:

March 10-13, 1981 Type of Inspectic Unannounced Material Control & Accounting Inspector:

W ~/

h I

//

d, uC D&te / Signed Approved by:

  • M
  • h m.

5 /5 /81 E. J. ScAlpine, Chief, Material Control and Date Signed Accountability Section, Technical Inspection Branch Engineering and Technical Inspection Division Inspection Summary:

Areas Inspected: Facility Operation and Storage and Internal Control.

The inspection involved 22 inspector hours onsite by one NRC inspector and was begun during regular hours.

Results: The licensee was found to be in compliance with NRC requirements in the two areas examined during the inspection.

S-F2 1E\\

La\\

em or_

copies 8103120580s 3

Pages This Docu=ent is not to be reproduced without specific ETEMI.TMUSWITED HEREWmf approval or IE:II CONTAINS 2.190INFORMATION