ML19347E317

From kanterella
Jump to navigation Jump to search
Forwards LER 81-018/03L-0
Date released: 12/27/2019 Download: ML19347E317


LER 81-018/03L-0:on 810329,power Operated Relief Valves Lifted to Limit Overpressure Condition Due to Safety Injection.Caused by Inadvertent Blocking of Low Pressurizer Pressure Safety Injection Signal During Train B Testing
ML19347E319
Person / Time
Site: North Anna Dominion icon.png
Issue date: 04/20/1981
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19347E319 (2)
Forwards LER 81-018/03L-0
ML19347E316
Person / Time
Site: North Anna Dominion icon.png
Issue date: 04/20/1981
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19347E316 (1)