ML19347E035
| ML19347E035 | |
| Person / Time | |
|---|---|
| Site: | 05000471 |
| Issue date: | 04/09/1981 |
| From: | Harold Denton Office of Nuclear Reactor Regulation |
| To: | Eisenhut D, Mattson R, Vollmer R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8104140726 | |
| Download: ML19347E035 (2) | |
Text
i
)
\\
m
}
1 X
3 i
es 1
I DiSTRIBUTI'ON Docket (50-471)
NRC POR HRDenton EGCase RTedesco EAdensam MEMORANDUM FOR:
Darrell G. Eisenhut, Director, DOL Richard H. Vollmer, Director, DOE Reading M le Roger J. Mattson, Director, DSI Stephen H. Hanauer, Director, DHFS Thomas Murley, Di rector, DST FROM:
Harold R. Denton, Director, CNRR SUBJ ECT:
REVIEV 0F PILGRIM 2 CF RULE SUBMITTAL The Pilgrim 2 submittal responding to the proposed CP ra'se on TMI requirements was received on April 6,1981. Our March schedule to Sevill predicted a 06/81 SER issue date and a 07/31 ACRS date. The dedicated reviewers met with the CP applicants on April 8,1981, and outlined for them the first cut at acceptance criteria for all the rule requirements.
Some reviewers were already prepared to give Boston Edison feedback on their submittal at this meeting.
Because things seem to be procuding well, I want you to schedule the Pilgrim 2 SER technical input to DL by May 8,1981.
This should provide sufficient time to resolve any remaining problem areas and issue the SER by June 1, 1981.
Your personal attention to this schedule will be necessary to assure that it is being met.
%813%nni bg
- a. R. a.*m,
Harold R. Denton, Director Office of Nuclear Reactor Regulation cc:
See next page U R / r.:::.
op 7/N Y g[]l ll $\\
I h
Ap
% q0198k X L
- h f 4
a 810.4140 M4 a
30R OMUR REVRtTE c~u >l..Nl.i.Ri R...
" " ~ ' >.HAe: e ut!n.
"4
%9?81.
I i
l DISTRIBUTION
, Review Team H. R. Denton, NRR V. Stello, I&E F. A11enspach, LQB V. Deliso, OLB Directors S. MacKay, PTRB R. Schemel, HFEB e
C. E. Rossi, ICSB
{
D. Eisenhut, DL R. Prevatte, PSB l
R. Mattson, DSI R. Vollmer, DE N. Wagner, RSB i
- 4. Mann, ASB I
S. Hanauer, CHFS
... Krug, AEB T. Murley, DST F. Skopec, RAB B. Grimes, DEP, I&E J. Boegli, ETSB M. Fields, CSB Assistant Directors T. Huang, CPB J. Gilray, CAB P. Check, PS C. Tan, SEB W. Kreger, RP H. Folk, SEB L. Rubenstein, CCS E. Hentinger. MEB Materials & Qualifications Engineering C. McCracken, CEB J. Knight, CiSE R. LaGrange, EQB M. Ernst Tecnnology E. Chow, RRAB R. Tedesco, Licenisng E. Williams, EPDP, I&E
- 0. Lasher, SIB Branch Chiefs C. Thomas E. Adensam, DL D. Vassallo, LGB D. Scaletti, DL P. Collins, OLS C. Moon, DL D. Ziemann, PTRB P. Leech, DL V. Moore, HFEB H. Faulkner, DL F. Rosa, ICSB M. Mallory, DL Power Systems Branch R. Purple, DL T. Speis, RSB
- 0. Parr, ASB R. Houston, AEB Radiological Assessment Branch W. Gamm111, ETSB W. Butler, CSB W. Johnston, CPB W. Haass, QAB F. Schauer, SEB R. Bosnak, MEB V. Benaroya, CEB Z. Rosztoczy, EQB A. Thadani, RRAB S. Ramos, EPDP, I&E
-.