pu Detrolt ms Edison wa._.r" CAT%g April 2, 1981 0
EF2-52-795 Ve
- v y
4k t7
."'b ~)Ig/
Mr. James G. Keppler, Director Region ill
{
/g U. S. Nuclear Regulatory Commission A ]gt 799 Roosevelt Road Glen Ellyn, IL 60137 1>
[g C
Dear Mr. Keppler:
Reference:
Enrico Fermi Power Plant, Unit 2 USNRC Licensing Docket:
50-341 USNRC IE Bulletin 80-21 (11-6-80)
Detroit Edison Letter EF2-49,889 (1-19-81)
Subject:
Detroit Edison Response to NRC IE Bulletin 80-21 The final report of our analysis and evaluations of the potential valve castings materials problem described in the subject bulletin cannot be sub-mitted to your office at this time.
Pursuant to the reporting requirements specified in the subject bulletin, we submit this second interim response:
The current status of our investigation of Fermi 2's safety-related valves that may contain parts cast by the Malcolm Foundry Company, Inc., is as follows. The names of the manufacturers supplying safety-related valves to the Fermi 2 Project are provided on the enclosed listing.
All of these manufacturers have completed their investigation (except General Electric) and have confirmed that the valves they supplied to the Fermi 2 Project do not contain Malcolm castings.
Per General Electric's response (TDEC-3957) (on file),
their investigation of safety-related valves purchased uader P.O.
The valve vendors that are still being investigated by General Electric are indicated on the enclosed listing. When General Electric has completed their review, the results of this review shall be summarized and forwarded to your office.
This situation necessitates that we renew our request for an indefinite extension of the reporting date.
Detroit Edison Project Engineering will continue to keep the review moving and will notify your office of any further developments.
Should you require additional information from Detroit Edison in this matter, please advise us.
Very truly yours, b/
S10 410 0l95(9 UEW yks a
e JDR:mb Encl.
APR 9 190 J
't l
Mr. James G. Keppler April 2, 1981 Page 2 EF2-52,795 The foregoing statement and the enclosed listing are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.
Y Dona l d A. We l l s, Mariage r Quality Assurance Subscribed and sworn to before me this M day t.*?rt.* 5 ,-"' h " 6 5 of April, 1981.
T@.Cd$f;f;{, 3 Not:rf tt; Cc==u.:n - e A4/22k//
A
' Otto ry Public)
I cc:
Director Division of Reactor Construction Inspection Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 Director Division of Operating Reactors Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Bruce Little, Resident inspector U. S. Nuclear Regulatory Commission Resident inspector's Office 6450 North Dixie Highway Newport, MI 48166 I
Y
Enclosure to Ef2-52,795 April 2, 1981 e
MANUFACTURERS OF EERMI 2 SAFETY RELATED VALVES Valve Vendors Whether or not the Supplied Valves contain Malcolm Castings No Anchor Darling Atwood & Morrill No No Control Components No Crosby No Dragon Fisher Controls No No GPE Controls No Harrison /Rockwell No Jamesbury No Kerotest No Marotta No Powell No Target Pock No Velan No Xomox Vendors of CE Supplied Valves - NSSS Atwood & Morrill (MSIV)
No Lunkenheimer (Recire. Gate Valve)
No No Copes Vulcan (Recirc. Bypass Valve)
No Crosby; Dikkers; Target Rock (SRV)
No Anchor Darling ITT Hamill (CRD Vent & Drain Valve)
Crosby (CRD Relief Valve)
Automatic Swits Company (CRD Solenoid Valve) t (HPCI System)
(RCIC System) i l
l l
- GE is still investigating these valve vendors, per TDEC-3957, dated Feb. 26, 1981.
.. - ~