ML19347D944

From kanterella
Jump to navigation Jump to search
Forwards LER 80-061/01X-2
Date released: 12/27/2019 Download: ML19347D944


LER 80-061/01X-2:on 800708,S&W Review of Auxiliary Feedwater Sys Design Determined That,Under Certain Conditions,Pump 1-FW-P-3B Might Provide Only 335 Gpm to Steam Generator. Caused by Incorrect Preliminary Engineering Analysis
ML19347D949
Person / Time
Site: North Anna Dominion icon.png
Issue date: 04/08/1981
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19347D949 (3)
Forwards LER 80-061/01X-2
ML19347D943
Person / Time
Site: North Anna Dominion icon.png
Issue date: 04/08/1981
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19347D943 (1)