Informs of Review of Criteria Re Upgrading of Emergency Support Facilities.Table Indicating Min Staffing Levels to Be in Effect by 810901 Encl.Conceptual Design Description of Emergency Response Facilities Will Be Sent by 810517
ML19347D905
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/06/1981
From: Clayton F
ALABAMA POWER CO.
To: Schwencer A, Varga S
Office of Nuclear Reactor Regulation
References
TASK-3.A.1.2, TASK-TM NUDOCS 8104140437
Download: ML19347D905 (4)


Text

_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _

Malling Address

, . AlJ bama Power Company 600 Nor*.h 18th Street Post Office Box 2641 l

Birmingham. Alabama 35291 l Telephone 205 783-6081 F. L. Clayton, Jr.

Rga' c;3gy"' Alabama Power

he southern ereclic system April 6, 1981 Docket 50-348 N J 50-364 i/ fD h' $5 m p.O@

a ~

Director, Nuclear Reactor Regulation p.

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 {h 'd/7gsA,,7/

Attention: Mr. S. A. Varga Mr. A. T. Schwencer Gentlemen:

Joseph M. Farley Nuclear Plant - Units 1 and 2 Upgrading of Emergency Support Facilities In response to Mr. D. G. Eisenhut's letter of February 18, 1981, Alabama Power Company has performed a review of the criteria contained in the above referenced letter. .

Alabama Power Company has established an operational technical support center (TSC) which is in close proximity to the control room.

The TSC has the capability to display and transmit plant status to those individuals knowledgeable of and responsible for engineering and manage-4 ment support of reactor operations in the event of an accident. The TSC is habitable to the same degree as the control room for postulated accident conditions. The Farley Nuclear Plant Emergency Plan has been revised to incorporate the role and location of the TSC. The TSC contains a set of P&ID's for each unit and technical manuals on selected major equipment.

Other technical data are readily available from the document control facility in the plant Service Building which may be reached by intraplant phone from the TSC. Also available in the TSC are the Emergency Plan, Emergency Plan Implementing Procedures, Abnormal Operating Procedures, Emergency Operating Procedures and Unit Operating Procedures along with other general reference material.

Alabama Power Company has also established an operational support center (OSC) functionally separate from the control room and other emergency response facilities. Communications have been provided from the OSC to the TSC, E0F, and control room.

1 h\ s M0.no0 kS' 9

I

~

Director, Nuclear Reactor Regulation April 6,1981 U. S. Nuclear Regulatory Commission Page 2 .

Alabama Power Company startup offices have been designated as the interim Emergency Operations Facility for Plant'Farley. These offices are located on the plant site outside the primary security area. Offices are available to accommodate federal, state and local officials and connunications to the plant and offsite organizations are provided.

The pennanent EOF will be located in the Farley Nuclear Plant Employment / Training / Visitor Center which is presently under construction and is currently scheduled for completion prior to October 1,1982.

This facility will comply with the habitability requirements (structure, protection factor, and ventilation protection) contained in Table 2 of NUREG 0696.

The attached table indicates the minimum staffing levels to be in effect at Farley Nuclear Plant by September 1,1981. Every reasonable effort required to augment any deficiency within 30 minutes will be taken. The senior manager will report to the EOF within four hours.

Full compliance with Table B-l of NUREG 0654 is expected by July,1982.

Alabama Power Company will submit, by May 17, 1981, a conceptual design description of Farley Nuclear Plant emergency response facilities.

If you have any questions, please advise.

Very truly yours,

~

y O' pus. '~j a sp

F. L. Clayton, Jr.

FLCJr/RWS:de Attachments l cc: Mr. R. A. Thomas (W/ Attachment)

Mr. G. F. Trowbridge Mr. E. A. Reeves Mr. L. L. Kintner "

Mr. W. H. Bradford l

I

.I E

\ ',. , . ' . ,

I l  %

HINIMUM STAFFING FOR DIERGENCIES -

Position Title 'On Capability for Addit'iot Major Functional Area Major Tasks or Expertise Shift

  • 30 min. 60 mii Plant Operations and Shift Supervisor (SRO) 1 - - - - ----=

Assessment of Oparational Aapects Shift Foreman (SRO) 1 i Control Room Operators 2f Auxiliary Operatora 2 l

Emergency Direction , . Shift Supervisor or 1** - - - - - - - =

and Control (Emergency Emergency Director Dirsetor)***

  • D Notification / Hotify licensee. State, 1 -

z Communication **** local and Federal personnel & maintain communication .

Raccvery -

Emergency Operations ..f' Senior Manager1 Facility Director Radiological Accident Technical Support On-call Emergency Asceoament and Support Conter Director

~

Director .

1 cf Operational Accident ,

Offsite Dose Senior Health Physics Anacsoment Assessment (llP) Expertisa

  • 1 - - - = -

Offsite Surveys 2** --- -

2

,0nsite (out-of-plaa.t) -

1** ---- 1 In-plant surveys Chemistry / Radio- '

HP Technicians Rad / Chem Technicians 2

2 g-chemistry ..

HP Support Counting Room Technician l' d Radiation Detection Han 1 ,

Nuclear Operative 1 ,

Plant System Technical. Support , Shift Technical Advisor 1 Engineering, Repair '

Core / Thermal Hydraulics 1** ----- 1 and Corrective Actions Electrical - --

1 Hechanical -- 1 Repair and Correctiva Hochanical Maintenance / 1**

1 Actions Rad Waste Operator 1 Electrical Haintenance/ 1** 1 1

, Instrument and Control

. (I & C) Technician 1

.i I

- g\ ..

f g {f&

t HINIMUM STAFFING FOR EHEliCENCIES (continued) , j Pooltion Titio On Capability for Ad,dtti Ha_ior Functional Area Haior Tasks or Expertise Shift

  • 30 min. 60 m Protective Actions Radiation Protection: 11P Techniciano 2** - ------ 2 (In-Plant) a. Access Control -
b. IIP Coverage for repair .

~

corrective actions. -

search and rescue first-  !

aid & firefighting -

c. Personnel monitoring .
d. Dosimetry ,

Firefighting -- , ----- Firo Brigade Local Support por Technical

. Specifications Rescue Operations "

and First-Aid -

2** Local. Support , g Site Access Control Security, firefighting Security Personnel All per and Personnel communications, personnel Security Plan Accountability accountability TOTAL -

15 2 17 NOTES: ' '

  • For each unaffected nuclear unit in operation, maintain at least one shift foreman, one control room operator and one auxiliary operator except that unita sharing a control room may share a shift foreman if all functions are covered. ,
    • Hay be provided by shif t personnel assigned 'other functions. -
      • Overall direction of facility response to be assumed by EOF director when all centers are fully manned. Director of minute-to-minute facility operations remains with senior managar in technical support center or control, room.
        • Hay be performed by engineering aide to shift supervisor.

1 AseniormanagerfromtheCorporateOfficevillproceedtotheEOFasindicatedinthepkan. '

          • Staffing capability in 60 minutes is dependent upon issuediata availability of personnel, time of day, weather conditions, or radiological conditions. . . ,

f For Modes 5 and 6' one control room operator and one auxiliary operator shall be on shift.

Staffing may be less than the minimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> provided that immediate action is taken to rest. ore staffing to the minimum requiremento. .