ML19347D872

From kanterella
Jump to navigation Jump to search
Informs of Intention to Request Tech Specs Change Re List of Containment Isolation Valves.New Hydrogen Monitoring Sys Manual Isolation Valves on Containment Air Sampling Inlet Lines Will Have New Conflicting Numbers
ML19347D872
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 04/10/1981
From: Tramm T
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.4.2, TASK-2.F.1, TASK-TM NUDOCS 8104140361
Download: ML19347D872 (1)


Text

Commonwealth Edison One First National Plaza. Chicago, Illinois Address Reply to: Post Office Box 767 Chicago, Illinois 60690

-fm%

. $ l '* I*/

April 10, 1981

, ?O'

/

.(\\h SI 1

2g 0g\\* g Mr. Harold R. Denton, Director a1

  1. h~)

$$$s Office of Nuclear Reactor Regulation

/7 o "#op#

U.S. Nuclear Regulatory Commission

\\

co#

ig/

Washington, DC 20555

~' /

Subject:

Zion Units 1 and 2 Containment Hydrogen Monitoring NRC Docket Nos. 50-295 and 50-304 Reference (a):

December 15, 1980 letter from J. S. Abel to D. G. Eisenhut

Dear Mr. Denton:

This is to inform you of our intention to request a change to the list of containment isolation valves in Zion's Technical Specifications.

As indicated in reference (a) we plan to complete installation of new contair. ment hydrogen monitors by January 1, 1982 to comply with the requirements of NUREG-0737.

Before those monitors go into operation a change will be required to the list of containment isolation valves contained in Table 4.9-3.

Installation of the new hydrogen monitoring system includes replacement of the half inch manual isolation valves on the containment air sampling inlet lines.

Solenoid operated vavles are being installed so that they can be controlled remotely.

The Zion 1 valves are being installed this spring.

This Zion 2 valves will be installed later.

The new valves have new numbers ana there will be a temporary conflicts between the valve numbers listed on Table 4.9-3 and the actual number on the containment isolation valves in those lines.

Manual control of the new valves will, however, be retainea to keep the plant consistent with the original design description until NRC issues a change to the Technical Specifications.

This will ensure that there is no unrevieweo safety question.

We plan to submit the proposed change within the next four weeks.

Please address any questions regarding this matter to me.

Very truly yours, Yk

~~

..~I T. R. Tramm Nuclear Licensing Aaministrator