h 65 l
?
?
d f
March 12, 1981 Sheldon J. Wolfe, Esq., Chairman Dr. E. Leonard Cheatum Atomic Safety and Licensing Route 3, Box 350A Board Panel Watkinsville, Georgia 30677 U.S. Nuclear Regulatory Comission Washington, D.C.
20555 DISTRIBUTION Mr. Gustave A. Linenberger p\\'
^,;g Black Atomic Safety and Licensing N'c N' !
Anderson U.S. Nuclear Regulatory Comission h kt;'
McGurren Board Panel d r[y,,\\ U)C s
b
\\
B.Youngblood Washington, D.C.
20555 b] u.a,AR l 6 J381 h -,
M C. Moon Reis Q
M7j@mer Q}/
Shapar/Engelhardt In the Matter of g
Christenbury/Scinto Houston Lighting and Power Company
,,4 j
FF (2)
(Allens Creek Nuclear Generating Station, Unit 1) w 4g NRC Central: LPOR/PDR/
Docket No. 50-466 l
TERA (2)
Dear Administrative Judges:
The Staff has reviewed its manpower resources, its internal review schedules, and the current schedule in this proceeding and has attempted to set forth a realistic schedule for the upcoming safety hearing sessions to commence t
on May ll, 1981. The Applicant has reviewed this revised proposed schedule and is in agreement with it. The Staff's revised proposed schedule for the first two hearing sessions is attached Sincerely, 1
l l
Richard L. Black Counsel for NRC Staff
Attachment:
As Stated cc:
(w/ attachment) l See Page 2 l
SS'$
Si 3
- ..w i
s.asur)'
1081yq,3 y c O '
4: =:o ra a u sc : 2:
OFFIC!s' R ECO RD COPY 7
S N
V V
W wY ST a.-
-2 cc: The Honorable Ron Waters J. Gregory Copeland Esq.
Susan Plettman, Esq.
David Preister, Esq.
Hon. Jerry Sliva Hon. John R. flikeska Mr. John F. Doherty Mr. William J. Schuessler Mr. F. H. Potthoff III Jack Newnan, Esq.
Brenda A. McCorkle Mr. Wayne Rentfro Carro Hinderstein Margaret Bishop J. Morgan Bishop Stephen A. Doggett, Esq.
Carolina Conn Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Board Panel D. Marrack Te ss Public Interest Research ap. Inc.
R, try N. Lemmer Le ot.s Johnston U.S. Nuclear Regulatory Consnission Region IV. I&E Bryan L. Baker Robin Griffith Mr. William Perrenod l
Docketing and Service Section l
l 0 ELD /k...
I
- " :o i
n.uc y RLB1,at/dkw
'RPtdssy-i
"" )
.03/.'.?/81.. !
l
,l.
v: <:~ r 3 24: v:v ::
OFFICIA L RECC RO COPY o: "- -
Procosed Schedule Testimony Submittal - April 20 May 11, 12 Alternate sites (Staff)
May 13 Doherty 20(a)
Gap conductance Doherty 39 Fuel swelling May 14' Doherty 3 Fuel specific enthalpy Doherty 7 LPCI cold-slug May 15 Bishop 4,5,7, 9,10 Pipelines May 18 TEXPIRG 6 Aircraft hazards May 19 Doherty 9 Containment building Doherty 27 Reactor Pedestal May 20 TEXPIRG 26 Computer code error May 21,22 Open hearing dates for completion of above issues
Testimony Submittal - May 11 June 1 Doherty 30 Interconnection / grid stability Doherty 10 Diesel generator reliability June 2 TEXPIRG 12 Cable fires TEXPIRG 39 Fracture toughness June 3 Doherty 47 Turbine Missiles June 4 ASLB 10 Bypass leakage ASLB 6 Compliance with General Design Criteria 50 June 5 ASLB 8 Seismic Category - control rods, control rod drives and control units Doherty 48 CRD return line June 8 Doherty 6 Recirculation pump overspeed Doherty 50 Jet pump beam */
June 9 TEXPIRG AC 21 Occupational exposure TEXPIRG 30 Charcoal adsorber June 10 Doherty 14,25 Fuel failure /MSLRM June 11,12 Open
- /
Subject to admission by the Board as a contention.
.