ML19347D383
| ML19347D383 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 03/12/1981 |
| From: | Trickovic R BECHTEL GROUP, INC. |
| To: | Thompson T EG&G IDAHO, INC. |
| References | |
| VB-81-0104, VB-81-104, NUDOCS 8103170523 | |
| Download: ML19347D383 (2) | |
Text
.-
m
-~ -
.s. MJ Bechte PowerCorporation Engineers-C,onstructors 15740 Shady Grove Road Gaithersburg. Maryland 20760 p{l7j%
301-258 3000
/\\ 'p
-4 y --
i
- p March 12, 1981
_ Mr. T. R. Tho=psotr
. y44
,[g/Sgk 2 s
y EG&G Idaho, Inc.
p A/
P.O. Box 1625 (TSB-6) 4 Idaho Falls, Idaho 83401 p
,^
a %vis ; ; y9e
Dear Mr. Thompson:
Huelear QA Is Applicable
~
Middle South Energy, Inc.
Grand Gulf Nuclear Station Units 1 & 2 Docket No. 50-416, 50-417 Bechtel Job No. 9645 File: 0266/L-334.0 Re: VB-80/0419 dated October 13, 1980 Auxiliary Building and Containment Building Seismic Ti=e Histories VB-81/0104 Enclosed is Bechtel proprietary infor=ation forwarded to you in confidence under the terms of the secrecy agree =ent submitted to Mr. Leo Kelly, General Counsel, EG&G Idaho, Inc.
This infor=ation is provided directly, at the reco==endation of Mr. J. A. Martore,
NRC, to assist you in conducting the structural review of Grand Gulf Nuclear Station.
The attached basemat rotational seismic time histories have been corrected for the Grand Gulf contain=ent and auxiliary buildings per our previous telephone conversations. This information is again forwarded in the form of punched cards and hard copy listings for your use.
The ti=e histories provided are:
1.
Containment Building A t=0.01 seconds RUNID T21038-1 OBE Rotation about EW axis (DOF 38)
OBE Rotation about NS axis (DOF 38)
SSE Rotation about EU axis (DOF 38)
SSE Rotation about NS axis (DOF 38)
N
%,
- O g 2.
Containment Building A t=0.005 seconds Q
RUNID T30376-1 h
OBE Rotation about EW axis (DOF 38)
Q, '.
OBE Rotation about NS axis (DOF 38) f y72 SSE Rotation about EW axis (DOF 38)
SSE Rotation about NS axis (DOF 38) j N
L
/
_,f' 8103170523
Bechtel Power Corporation EG&G Idaho, Inc. March 12, 1981 Bechtel Job No. 9645 VB-81/0104 3.
Auxiliary Building A t=0.01 seconds RUNID T30199-1 OBE Rotation about EW axis (DOF 10)
~
OBE Rotation 1tbout NS axis (DOF 10)
SSE Rotation about EW axis (DOF 10)
~
SSE Rotation about NS axis (DOF 10) 4.
Auxiliary Building at=0.005 seconds RUNID T80133-2 OBE Rotation about EW axis (DOF 10)
OBE Rotation about NS axis (DOF 10)
SSE Rotation about EW axis (DOF 10)
SSE Rotation about NS axis (DOF 10)
Should you have additional questions regarding this information, please contact us.
Very truly yours, R. S. Tricko Project Engineer RLB/mb
Enclosure:
Submittal of Confidential and Proprietary Bechtel Information Applicable Systems: None cc:
J. P. McCaughy, Jr., w/o*
l L. F. Dale, 2w/o*
i C. K. McCoy, w/o*
T. H. Cloninger, w/o*
T. E. Reaves, w/o*
Dr. D. C. Gibbs, w/o*
J. D. Richardson, w/o*
J. N. Ward, w/o*
A. Zaccaria, w/o*
D. M. Doyle, w/o*
H. H. Weber, w/o*
C. D. Wood, w/o*
C. E. George, w/o*
l R. L. Scott, w/o*
M. D. Archdeacon, w/o*
r J. A. Martore (NRC), w/o*
- Enclosures to EG&G only; no copy of enclosures to files l
<.(.1
~
l