ML19347D000
| ML19347D000 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 03/04/1981 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | Schwencer A, Varga S Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19347D001 | List: |
| References | |
| NUDOCS 8103100498 | |
| Download: ML19347D000 (1) | |
Text
Alabama Power Company 600 North 18tn street Post Office Box 2641 Birmmgnam. Alabama 35291 Te4ephone 205 250-1000 m
F. L CLAYTON, JR.
senior Vice President Alabama Power March 4,1981 Docket Nos. 50-348 50-364 o
A S
Director, Nuclear Reactor Regulation j
U. S. Nuclear Regulatory Comission i
l'IAR09 p81m Washington, D. C.
20555 2
r as,km,%
..g Attention: Mr. S. A. Varga Mr. A. T. Schwencer
//
s REF: APC0 Letter to NRC dated 1/5/81, st.
Clayton to Varga JOSEPH M. FARLEY NUCLEAR PLANT - UNITS 1 AND 2 TECHNICAL SPECIFICATIONS Gentlemen:
As requested by the NRC staff, Alabama Power Company hereby submits the enclosed confirmation of the basis for the loss of flow trip to prevent DNB in the event of a loss of one or more reactor coolant pumps. The minimum DNBR for the loss of flow transients is limited to 1.34 which is consistent with the margin used to offset the rod bow penalty in the referenced Unit 1 proposed technical specification change. The same margin is currently used in the Unit 2 technical specifications. Therefore, both the Unit 1 and 2 Technical Specifications Bases should be modified as indicated in the enclosure to reflect this new DNBR limit.
Should you have any questions, please advise.
Yours very truly, 0 bd/
Ae F. L. Clayton, Jr.
FLCjr/RWS:rt Enclosure cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. E. A. Reeves (w/ enclosure)
Mr. L. L. Kintner (w/ enclosure)
Mr. D. J. Vito (w/ enclosure)
Mr. W. H. Bradford (w/ enclosure)
(30%
810810 OR'ip S(
I