ML19347C991

From kanterella
Jump to navigation Jump to search
Discusses Results of Auxiliary Feedwater Pump Endurance Test for Unit 1 Submitted 801104.Since Test Results Were Acceptable Util Does Not Intend Repeating Tests on Unit 2
ML19347C991
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 03/03/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8103100453
Download: ML19347C991 (1)


Text

TENNESSEE VALLEY AUTHORITY CH AT T ANOOG A. TENNESSEE 37401 400 Chestnut Street Tower II N

o 4

March 3, 1981 p

FT

,,t MAE 0.91981 *)

Director of Nuclear Reactor Regulation Attention:

Mr. A. Schwencer

,. g comrasses Licensing Branch No. 2

/

Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555 Dear Mr..Schwencer In the Matter of the Application of )

Docket No. 50-328 Tennessee Valley Authority

)

My letter to H. R. Denton dated November 4, 1980, submitted the results of the Auxiliary Feedwater Pump endurance test required by NRC Task Action Plan item II.E.1.1 for Sequoyah Nuclear Plant unit 1.

The results of this test showed the Auxiliary Feedwater System design at Sequoyah was acceptable. We believe that the results oi" the unit 1 test are sufficient to justify not repeating the tests on unit 2.

- If you have any questions, please get in touch with D. L. Lambert at FTS 857-2581.

Very truly yours, TENNESSEE VALLEY AUTHORITY 1

L. M. Mills, Nanager Nuclear Regulation and Safety Sworn-subscrib before me this i day of t d 1981 f)

(

Notary Public My Commission Expires

/

l l

D r910810 0 h'

An Equal Opportunity Employer 1