ML19347C955
| ML19347C955 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 03/04/1981 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | Schwencer A, Varga S NRC, Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8103100381 | |
| Download: ML19347C955 (1) | |
Text
Alaesma P;wer Company 600 North 18th street Post Office Box 2641 Birmerignem. AJaosma 35291 Telephone 205 250-1000 m
F. L CLAYTON, JR.
senior vice President Alabama Power the southern ewwtre system Docket Nos. 50-348 N
g 50-364 S
i Directo.', Nuclear Reactor Regulation y
U. S. Nuclear Regulatory Comission Irf4 R 0 9 19OI " C Washington, D. C.
20555 7
me,
}
Attention: Mr. S. A. Varga y
Mr. A. T. Schwencer 4
We REF: Letter from Mr. F. L. Clayton, Jr. to Mr. A. T. Schwencer dated July 17, 1980 JOSEPH M. FARLEY NUCLEAR PLANT - UNITS 1 & 2 CONTROL ROOM DESIGN REVIEW Gentlemen:
In the above referenced letter, Alabama Power Company committed to perform a confirmatory sound survey to verify that the control room noise level is at an acceptable level. On January 7, 1981 Alabama Power Company performed these confirmatory sound level measurements in the Unit 1 & 2 control rooms and verified that the noise level in the control room is acceptable.
The base sound level was found to be 58-60 dBA which is in agreement with measurements taken November 23, 1980, after air handling system modifications were completed. Alarm levels were measured and where required, were adjusted to be approximately 8 dBA above the control room base level.
It is the opinion of Alabama Power Company that the control room noise and alarm levels are acceptable and that no further action is required.
If you have any questions, please advise.
Ycurs very truly, N
. Clayton, r.
5 FLCjr/RWS:rt cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Apk' Mr. E. A. Reeves Mr. L. L. Kintner V
h(
Mr. W. H. Bradford 58 81 0310 0381
(