ML19347C760

From kanterella
Jump to navigation Jump to search
Informs That Plant Will Shut Down This Wk to Repair Turbine Stage Drain Line (non-nuclear Related & to Conduct Semiannual Control Rod Drive Performance Tests.Work Should Be Completed in Two Days
ML19347C760
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 12/05/1975
From: Blombach M
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Strasma J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8102130096
Download: ML19347C760 (1)


Text

0 {

jMtsPosr4 s

MGMCGRT HSA 9

- { g <-

,96 ye 4

1-01c075C339004 12/05/75 LUE5feln Uniun IV pgWd.r N

d 2

(

a i, s

..t TLX CONSP0eER JKN

)

004 OLY JACKSON MICH 12/5/75 1

C C

NUCLEAW PEGLLATORY COMMISSION C

ATT J A t: STRASMA 799 ROUSLvELT RO r

GLEP-ELLYN, IL 60137 C

C JAC< SON, "ICn DECEMBER 5.

1975 -- CONSUMERS P0aER COMPANY ANNOUNCED TODAY,'THAT ITS SIG ROCK AOINT PLANT wILL PAVE A SCHEDULED SHUTOOWN O

LATE FRIDar NIGmi TO REPAIR A TUReINE STAGE DRAIN LINE aHICM IS NON-NUCLEAd RELATED.

OURING THE SHUT 00aN, PLANT PERSONNEL NILL ALSO CONOUCT TrE SEMI-ANNUAL CONfROL ROD DRIVE PERFOGMANCE TESTS.

C IT IS ANTICIPATED THAT REPAIAS AND TESTING *ILL BE COMPLETFD IN T*O DAYS.

M k bLurtAC*

CONSo"EES PO*ER COMPANY 212 - MICHIf.,aN AVE Cl a 13:54 EST MGMCGHT NSA

(

C C

D

.1.,

s\\

C C

0 hC

$'s e

t

?'C e

\\

..