ML19347C232
| ML19347C232 | |
| Person / Time | |
|---|---|
| Site: | Vallecitos File:GEH Hitachi icon.png |
| Issue date: | 06/10/1980 |
| From: | Advisory Committee on Reactor Safeguards |
| To: | Advisory Committee on Reactor Safeguards |
| References | |
| ACRS-MS-0597, ACRS-MS-597, NUDOCS 8010170068 | |
| Download: ML19347C232 (2) | |
Text
REVlSED 6/10/80 W- ?.7 o
\\CRS SU300*iMITTEE MEETING ON THE GENERAL ELECTRIC TEST REACTOR (GETR j, /J /,
JUNE 16 a 17, 1980 SUN')L, CA TENTATIVE SCHEDULE JUNE 16, 1980 SPEAKER APPROXIMATE TIME Kerr 8:30 a.m. - 8:45 a.m.
Chairman's Opening Statement NRC Staff 8:45 a.m. - 9:00 a.m.
Introductory Statement GE 9:00 a.m. - 9:15 a.m.
Introductory Statement 9:15 a... - 10:15 a.m.
GETR Facility and Modifications GE Description, Required Safety System
- BREAK ************
10:15 a.m. - 10:30 a.m.
10:30 a.m. - 11:30 a.m.
Seismic Analyses (Structures & Equipment)
GE Methodology 11:30 a.m. - 1:00 p.m.
Result of Seismic Analyses (Structures &
GE Equipment)
- LUNCH ************
1:00 a.m. - 2:00 p.m.
2:00 p.m. - 3:30 p.m.
Status of NRC Evaluation of Plant NRC Staff Structures GE 3:30 p.m. - 4:15 p.m.
Landslide Stability Program
- BREAK ************
4:15 p.m. - 4:30 p.m.
4:30 p.m. - 5:30 p.m.
Public Comments
- 5:30 p.m.
End of Business Day NOTES:
- 1.
Request for oral statements:
Dee Price; SMUD Ratepayers Asso. (10 mins.)
(10 mins) a.
( 5 mins) b.
Helen Hubbard; Citizens for Total Energy (15 mins.)
Diane Hughes
( 5 mins)
Sue Hughes
( 5 mins)
Kaye Huhlman
( 5 mins) c.
Allow 30 mins. for late requests 8 030379 agg
o.-
ACRS SUCC0"ri1TTEE MEETING ON THE GENERAL ELECTRIC TEST REACTOR (GETR) JUNE 16 & 17, 1980 SUNOL, CA JUNE 17, 1980 APPROXIMATE TIME SPEAKER 8:30 a.m.
Chairman's Open ng Statement Kerr i
NRC PRESENTATION 8:45 a.m. - 9:30 a.m.
Staff Review of Site Geology GSB/HGES 9:30 a.m. - 10:30 a.m.
Geology USGS
- BREAK **********
10:30 a.m. - 10:45 a.m.
10:45 a.m. - 11:45 a.m.
Review of Probabilistic Analysis by LLL/ TERA NRC Consultants 11:45 a.m. - 12:15 p.m.
Review of Probabilistic Analysis NRC Staff
- LUNCH **********
12:15 p.m. - 1:15 p.m.
1:15 p.m. - 1:45 p.m.
Proababilistic Analysis Input Assumptions Sl emmons 1:45 p.m. - 2:15 p.m.
Geology (Conclusions)
GSB 2:15 p.m. - 3:15 p.m.
Seismic Design Basis NRC Staff (Hall)
- BREAK **********
3:15 p.m. - 3:30 p.m.
GE PRESENTATION 3:30 p.m. - 5:30 p.m.
Geology GE soil age interpretation of excavation photographs etc.
5:30 p.m. - 6: 00 p.m.
Probability Analysis GE 6:00 p.m. - 6:30 p.m.
_ Caucus and Adjournment i