ML19347C103

From kanterella
Jump to navigation Jump to search
Notifies That Review of Facility 800924 Occurrence Re Incorrect Setting of High Steam/Flow Bistable Trip Setpoints Does Not Meet Immediate Rept Criteria.Followup Rept Will Not Be Submitted.Steam Flow Transmitter Calibr.Bistables Reset
ML19347C103
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 10/06/1980
From: Yundt C
PORTLAND GENERAL ELECTRIC CO.
To: Engleken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
CPY-933-80, NUDOCS 8010160587
Download: ML19347C103 (1)


Text

@

A$

s e' v

o

,c ~=

~

og! ~9'h:Of t~-

5 ' -- N.. -

f N s' Ch

~~

~*.=

'9

[

ISg0

~

s A

y

: 1r '

3!;i,TN C 7. inn

.s

,y

t. a,

w ms 503 N"i October 6, 1980 CPY-993-80 Mr. R. H. Engelken, Director Nuclear Regulation Commission, Ragion V 1990 North Californi:t 91vd.

Walnut Creek, CA 945'>o '

Dear Sir:

On September 25, 1980, a letter was transmitted to your office concerning an immediate report made both to Mr. M. H. Malmros, USNRC Resident Inspector, and to the NRC Operation Center by " red phone." These reports and the September 25, 1980 letter described a situation in which the high steam flow bistable trip eetpoints were set incorrectly.

This report was made pursuant to the regulations established by 10CFR50.72, Notification of Significant Events. Subsequent review of the occurrence of September 24, 1980 has determined that it does not meet the criteriz for immediate reports contained in the Technical Specifications. This is due to the fact that mitigating circumstances resulted in the actual high steam flow setpoint being within that allowed by the Technical Specifications. Therefore, no written followup report will be submitted.

l Both PGE and Westinghouse are continuing to review this situation for report-ability under the Technical Specifications and 10CFR21.

In the meantime, all steam flow trantmitters have been calibrated to the correct data, and the high steam flow bistables were reset to the correct values. This was completed on October 3,_1980.

The details of.the' circumstances surrounding this event have been discussed with Mr. M. H. Malmros, USNRC Resident Inspector.

Sincerel" C. P. Yundt General Manager CPY/WSO:na