MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station ML20148K4161997-05-31031 May 1997 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20141B9631997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Pilgrim Nuclear Power Station ML20137T5631997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Pilgrim Nuclear Power Station ML20136G7791997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Pilgrim Nuclear Power Station ML20138K5811997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Pilgrim Nuclear Power Station ML20133G5831996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Pilgrim Nuclear Power Station BECO-96-106, Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-097, Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station ML20128N2611996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-083, Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr1996-08-31031 August 1996 Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr ML20116L0841996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-066, Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-056, Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station ML20117E0961996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-034, Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-023, Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-008, Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-004, Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station ML20095E7351995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Pilgrim Nuclear Power Station Unit 1 BECO-LTR-95-116, Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station ML20093F5221995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-097, Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-081, Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-071, Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant1995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20212C2921999-09-16016 September 1999 SER Accepting Licensee Request for Relief from ASME Code Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Pilgrim Nuclear Power Station ML20216F3511999-09-0808 September 1999 ISI Summary Rept for Refuel Outage 12 at Pnps ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209C4731999-07-0707 July 1999 Addendum to SE on Proposed Transfer of Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generation Co ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20196H2451999-06-29029 June 1999 SER Denying Licensee Proposed Alternative in Relief Request PRR-13,rev 2.Staff Determined That Proposed Alternative Provides Insufficient Info to Determine Adequacy of Scope of Implementation ML20209A8901999-06-28028 June 1999 SER Accepting Licensee Proposed Alternative to Use Code Case N-573 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209B9861999-06-23023 June 1999 Rev 13A to Pilgrim Nuclear Power Station COLR for Cycle 13 ML20217N9061999-06-21021 June 1999 Rept of Changes,Tests & Experiments for Period of 970422-990621 ML20195K3431999-06-15015 June 1999 Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water System Piping for Plant ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20207E7471999-05-27027 May 1999 Safety Evaluation Granting Request Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of HWC to License DPR-35 ML20206M1971999-05-11011 May 1999 SER Accepting Request for Approval to Repair Flaws in ASME Code Class 3 Salt Svc Water Piping at Plant ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207J5471999-03-0909 March 1999 Training Simulator,1999 4-Yr Certification Rept ML20207F9401999-03-0101 March 1999 Long Term Program Semi-Annual Rept for Pilgrim Nuclear Power Station ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20196E2151998-12-31031 December 1998 1998 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20153D3901998-09-22022 September 1998 Safety Evaluation Granting 970707 Request to Use Guidance in GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Pilgrim Nuclear Power Station ML20197C5011998-09-0404 September 1998 Rev 12C,Pages 4 & 5 to Pilgrim Nuclear Power Station Colr ML20197C5471998-08-31031 August 1998 Rev 12C to Pilgrim Nuclear Power Station Colr ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237E2251998-08-26026 August 1998 Suppl & Revs to SE for Amend 173 for Pigrim Nuclear Power Station ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236U8201998-07-13013 July 1998 Rev 12B to Pilgrim Nuclear Power Station COLR (Cycle 12) ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20207B7601998-03-31031 March 1998 Final Rept, Pilgrim Nuclear Power Station Site-Specific Offsite Radiological Emergency Preparedenss Prompt Alert & Notification System Quality Assurance Verification, Prepared for FEMA ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20216J3741998-03-19019 March 1998 Safety Evaluation Accepting Licensee Request to Evaluate Elevated Tailpipe Temp on Safety Relief Valve SRV 203-3B ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20236M8511997-12-31031 December 1997 1997 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station ML20202D5761997-11-0808 November 1997 1997 Evaluated Exercise BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217D6431997-10-0101 October 1997 Safety Evaluation Granting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Class 3 SSW Piping for Pilgrim ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station 1999-09-08
[Table view] |
Text
-.. .
i- .
9 l
OPERATING DATA REPORT I
DOCKET NO. 50-293 i
DATE 10/10/80
- COMPLETED BY G.G. Whitney TELEPHONE 617-746-7900
- OPERATING STATUS Pilgrim 1 Notes I. Uni
- Name:
- 2. Reporting Period: September, 1950
- 3. Licensed Thermal Power (MWt): 1998.
4 .%eplate Rating (Gross MWe): 678. '
I 5. Design Electrical Rating (Net MWe): 655.
- 6. Maximum Dependable Capacity (Gross MWe): 690.
r j
- 7. Maximum Dependable Capacity (Net MWe): 670.
i
- 3. If Changes Occur i:1 Capacity Ratings (Items Number 3 Thmugh 7) Since Last Report. Give Reasons:
I' NONE 4
3 NONE
- 9. Power Level To Which Restricted.lf Any (Net MWe):
- 10. Reasons For Restrictbns.lf Any:
! N/A 1
l This Month Yr..to-Date Cumulative i
- 11. Hours In Repot..ng Period 720.0 6575.0 68471.0
- 12. Number Of Hours Reactor Was Cr4ical 720.0 3256.8 48237,7
- 13. Reactor Reserve Sh"tdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 716.7 3113.8 466o0.3
- 15. Unit Resene Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1356384.0 5616936.0 78708048.0 .
- 17. Gross Electrical Energy Generated (MWH) 468280.0 _,
1917570.0 26082404.0
- 18. Net Electrical Energy Generated (MWH) 450604.0 1844023.0 25050146.0
- 19. Unit Semce Factor 99.5 47.4 68.2
- 20. Umt Availability Factor 99.5 47.4 68.2
- 21. Unit Capacity Factor (Using MDC Net) 93.4 41.9 54.6
- 22. Unit Capacity Factor (Using DER Net) 95.5 42.8 33.>
- 23. Unit Forced Outage Rate 0.0 3. I 10.2 l
- 24. Shutdowns Scheduled Over Next 6 Month;iType.Date, and Duration of Eachi: l i
l NONE I l
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: UNIT OPERATING
- 26. Units in Test Status a Prior to Commercial Operationi: Forecast Achieved i
! INITIA L CRITICALITY j INITIAL ELENICITY COMMERCIAL OPERATION 801016O N '"' '
. AVERAGE D A!LY UNIT POWER LEVEL 4
DOCKET NO. 50-293 Pilgrict 1 UNIT DATE 10/10/80 ti G.G. Whitney COMPLETED BY l
TELEPHONE 617-746-7900 4
i i September, 1980 MONTH
- DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
- (MWe Net) (MWe Net) 1 359. g7 666.
I : 596. g3 665.
I 664. g9 664.
i 3
~~
4 662. 20 665.
j g 662. ,g 602.
660. 666.
o 22 j 7 610. ,3 666.
I 662. 664.
3 24 665. , 665.
9
! 665. 665.'
10 25
- 666. ; 337.
664 466.
1 g
663. 582. i 13 29
[4 623. 30 653.
1 666. O.
33 16 665.
'l i" -
INSTRUCTIONS -
.l Cn th:s format.!ist the average datly unit power !evelin MWe Net for each f.sy in the repomng .nunth. Cam::ute to the nearest wnoie meg 2wstt
l l
,;'!l -l\
i.~
y 0 .
e 0 g G.
_ n 9 t n l 1 t 7 n i H 0 i - i n l i
m 8 h 6 o a N 3 i /
9 r 0 W 4 7
p e I l c 2 g 1 .
- h c s el i e e 0
- l i
/
0 G.
7 1
4 t
r ntamF oa ec) ss u
5 P 1 G 6 e e r f o infI' t
D i. H S o
v c o eio s l e i
n f . t t s nfoi ss e r u l
m O.EEyE e o au s o noi s t n t a N AMlA D ON g ei I I s ga S g
taep
~
su,ce ap r s e i
E N D Ei I l C ,, H j t e e , Gahe s pS H 1
s KI I P. & ,, ur ge i es ys )
b h i
I E. i. e3n e t
o nd i Pint 1 i M' N l l s u
k ai h x s e6 h Mt l
P E T t a h s EfIo 1
a I
M' I
C a c ne c :n v. 0 1 l O P al xr
(' l E e pe t 4 5
_ d u et b t a aW c
I l t
_ ur I l d e Wa
_ et CS h a C
_ c e U n Sh R o S 0
_ N 8 .
O 9 m
- l 1 ,
!j,xu l
l l
i . as )n l
C ' C C mei a aSl S' gu X X
. U r E E sei c x p D e T T StaE E bn I l
_ H I l l
- a a l l m (s e i uu oe H t s,9G h o annt a ut h p
teMMAO I ! l l i
- W S e g' atu C W M1234 O
. P D l l 3
._ N i N
_ A S O e I I .
N M c s ,t _
n ns W
)
I e :v e o p A. A.
M R .k l e n l O I R N N o _
l P i i L ta .
H H n i
- l S n s
l a i
N 3==;;y y_o I x
_ I I
Egdi 2 1
)
n e )
s n 3 ,j 5e ia n i lp e la c p
. s ni i
x l
(t iol I i E ?;$ A B e e s s & (
r s it g n luT if s n tsi so) _
ao enea in Rivl I
e ai a
_ tj5$ c y I'sa tllp a 3 0 tnn ea gs os t s nw c2g$ nt oi s
_ 3 0 ninu mni el pt el ai a s al us ns ee eh nlioE (
o li s. f ge s a a e e pl pt aiMHHOAOO i
gF a S e l L -
HAICD1fGI l - I 2
0 7 t
e 1 2
a / /
D 8 9 0 0 d
/ / l e
0 0 d u 8 8 ed sche
_ o t l' S )
- o. 7 8 7. -
1 N 1 S 1
/
8 i
f
,l
. b/
1
- i. REFUELC'G DiTORMATION i I
i I
l ""he following refueling information is included in the Monthly Report as requested in a letter to Mr. G. C. Andognini dated January 13, 1973:
i For your convenience, the infor=ation supplied has been enu=erated so that each 1
nu=ber corresponds to equivalent notation utili:ed in :he request.
,i ne na=e of :his facill:7 is Pilgrim Nt. clear ?cwer Station, Docket No. 50-293.
- l. !1 4
- 2. Scheduled date for nex: Refueling Shutdown: Septe ber, 1981
- 3. Scheduled data for restar: following refueling:
4 i
- 5. Oue to their s1=ilart:7, requests 4, 5, & 6 are responded :o collec:1vely:
R
- 6. The fuel, which ha[d.been loaded during :he 1980'_ scheduled refueling
- outage, is of the new ?Sx3R design, consisting of approxi .acaly 64 PSDR3232 j assemblies and 120 PSDRB265 assemblies.
i l 7. (a) 'here are 580 fuel asse=blies in :he core. '
(b) ~here are 764 fuel asse=blies in :he spen: fuel pcol.
1 1 3. (a) 'he sca:1cn is presen:ly licensed to s: ore 2320 spent fuel asse:blies.
j he ac ual spen: fuel storage capaci:7 is '. 770 fuel asse=blies at j
- present.
! (b) 'he planned spent fuel s:: rage :apaci:7 is 2220 fuel asse:blies. -
i i
- 9. With present spen: fuel in storage, the spent fuel pool new has :he capacity to acco==oda:e an addi ional 1006 fuel asse=blies. ,
i 1
I l
4 4
1 l
l l
I 1
i 1
1
PILGRIH NUCLEAR POWER STATION Honti Sep tembe r, 1980 .
M 10R SAFETY RELATED MAINTENANCE j STDI COMPONENT , MALFUNCTION CAUSE MAINTENANCE CORRECTIVE ACTION ASSOCIATED LER Tn piirurtrr vernnureer r i
! 56 Snubber Piston Rod broken Excess Replaced snubber PDCR 80-47 changed 3 Kip snubber 80-05 3/03L-0 S-23-3-36 -
_ . sp>venent , _
with 20 Kip snubber i j l 1 29 "A" SSWP Dis- Valve Leaking Eroded Dis ( Replaced Disc In-kind replacenent of disk charge Check V< ,1 ve i i
30 RBCCW Pump Motor Failure Unknown Replaced Motor Burned out notor sent out for 80-050/0lX-0 Motor rewind.
- .+
4 i
!~
t i
t
.i
^
=
~
q 1
l BOSTON EDISON COMPANY PILCRIM NUCLEAR POWER STATION Summary of Operations for September, 1980 On Sept. 1, 1980 the unit was placed on the grid at 0319 hrs, af ter completion of repairs to "B" train 4th point heater.
Reached 100% Rx. power at 1800 hrs. on Sept. 2. Reduced to 50% power at 0001 on Sept. 7 for main condenser backwash and returned to 100% at 0800 hrs.
Ibintained 100P. power until Sept. 13 when power was trimmed over low tides due to condenserd K. Reduced to 50% at 0001 on Sept. 14 for main condenser backwash and returned to 100% at 1330 hrs.
Reduced power to 50% on Sept. 21 at 0400 hrs. for backwash of main condenser and returned to 100% at 1531 hrs.
Reduced to 50% at 0001 on Sept. 27 for backwash of main condenser and cleaning o f "A" and "B" RBCCW heat exchangers. Held power at 60% during cleaning of "A" heat exchanger and increased to 86% on Sept. 28 at 0800 hrs. Continued slow increase under directicn of Rx. Engineer on Sept. 29 at 0912 hrs; reduced to 65% for control rod pattern adjustment. At 1214 hrs. started power increase and reached 100% at 0100 hrs. on Sept. 30. Started trimming power at 1400 hrs.
for cond, demin. d/P winding up at 93% at 2400 hrs.