ML19347B773

From kanterella
Jump to navigation Jump to search
Discusses Licensing Status Re Fuel Loading Date,Tech Specs & Environ Protection Plan.Estimated Fuel Loading Date Is 801015
ML19347B773
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/30/1980
From: Kintner L
Office of Nuclear Reactor Regulation
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 8010150638
Download: ML19347B773 (2)


Text

+

(

UNITED STATES E,,

-q [%$

NUCLEAR REGULATORY COMMISSION C~~

7;.

/. E WASHINGTON. D. C. 20555

\\

d s

Docket No. 50-364 U' 3 013cu 4

MEMORANDUM FOR: Darrell G. Eisenhut, Director Division of Licensing l

a THRU:

Robert L, Tedesco, Assi Director for Licensing, DL A. Schwencer, Chief, Licensing Branch No. 2, DL FROM:

Lester L. Kintner, Project Manager Licensing Branch No. 2, DL

SUBJECT:

STATUS OF FARLEY 2 LICENSING (SEPTEMBER 26, 1980) l.

Plant Status Estimated fuel loading date is October 15, 1980.

2.

Licensina Status Supplement No. 4 to the SER, Addendum to the Final Environmental Statement, Technical Specifications and Environmental Protection Plan were sent to reproduction for printing. The fuel loading and low power testing license is in the concurrence chain.

Input for Supplement No. 5 to the SER to support the full power license is being prepared.

Staff completed SE input on schedule for:

II.B.3 Post Accident Sampling (ETSB)

III.D.l.1 Primary Coolant Outside Containment (ETSB)

The following SE inp'ut was scheduled for this week.

It will be slipped one week.

6.

IE Bulletin 80-06 (ICSB) 7.

IE Bulletin 79-27 (ICSB) 11.

Containment Sump Performance (RSB) 15.

Emergency Operating Procedures - ATWS (PTRB) 17.

Power to Auxiliary Feedwater Valves (ICSB) 4

o SEP 3 01980 I.C.8.

Revise Emergency Procedures (PTRB)

II.E.1.1 Auxiliary Feedwater Reliability (ASB)

II.K.3 C.10 B&O Task Force - Anticipatory Trip (ICSB)

III.D.l.1 Primary Coolant Outside Containment (CSB)

Applicant provided all information expected this week except:

3.

ContainmentPurgeValves(CSB,EQB) 5.

Q-List (QAB)

M)/-

-W L. L. Kintner, Project Manager Licensing Branch No. 2 Division of Licensing cc:

H. R. Denton R. L. Tedesco A. Schwencer.

NRR ads f

"*a 4.-

r l

l

. -....-