ML19347B627

From kanterella
Jump to navigation Jump to search
Application for Suppl 1 to Proposed Change 86-1 to App a Tech Specs of License DPR-28 to Reflect Current Organizational Structure of Util & Yankee Atomic Electric Co & to Include Shift Technical Advisor on Table
ML19347B627
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 10/07/1980
From: Heider L
VERMONT YANKEE NUCLEAR POWER CORP.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19347B628 List:
References
WVY-80-141, NUDOCS 8010150461
Download: ML19347B627 (2)


Text

. . . Proposed Change No. 86-1 g Supplement 1 N Y) V ERMONT Y AN K EE N UcLEAR POWER CONPOR ATION C'XD d

SEVENTY SEVEN GROVE STREET (UTI. AND, Yl'IISIO NT 05701

  • ENGINEERING OFFICE TURNPlKE RO AD WEST DORO. M ASS ACHUSETTS 015 81 TELEPHONE 617-366-9011 October 7,1980 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Office of Nuclear Reactor Regulation Re ferences : (a) License No. DPR-28 (Docket No. 50-271)

(b) USNRC Letter to All Boiling Water Reactors, dated July 2,1980 (c) Proposed Change 86, WVY 80-65 " Vermont Yankee and Yankee Atomic Electric Company Organizations" April 23, 1980

Subject:

Vermont Yankee and Yankee Atomic Electric Company Organizations -

Supplemental Information

Dear Sir:

Pursuant to Section 50 59 of the Commissions Rules and Regulations, Vermont Yankee hereby proposes the following modification to Appendix A of the Operating License.

Proposed Change:

A change is proposed to Figures 6.1.1 and 6.1.2 of the Vermont Yankee Technical Specifications to reflect the current organizational structure of the Vermont Yankee Nuclear Power Corporation and Yankee Atomic Electric Company and to include the Shift Technical Advisor on the on-site table of organization. The attached copies of Figures 6.1.1 and 6.1.2 are provided to replace the revisions of those figures forwarded by Reference (c).

Reason for Change:

Reference (b) transmitted model standard Technical Specifications which were intended to provide guidance in the scope and types of specifications required to assure that facility operation is maintained within acceptable limits following implementation of the TMI Lessons Learned Category "A" items. We have determined that revision to Figare 6.1.2 of the Vermont Yankee Technical Specifications is appropriate. The revision to Figure 6.1.1 reflects a change in the organizational structure of the Vermont Yankee Nuclear Power Corporation and Yankee Atomic Electric Company. These revisions are identified above and in the attached Technical Specification pages.

8010150 6/ /

. . United States Nuclear Regulatory Commission October 7,1980 Attention: Office of Nuclear Reactor Regulation Page 2 Safety Consideration:

This proposed change is administrative in nature.

This proposed change has been reviewed by the Vermont Yankee Nuclear Safety Audit and Review Committee.

Fee Determination:

This change is pro forma, administrative in nature, and has no safety or environmental significance. For these reasons, Vermont Yankee Nuclear Power Corporation proposes this change as a Class II Amendment. A payment of

$1,200.00 has already been provided by Reference (c).

Schedule of Change:

The changes described above will be incorporated into the Vermont Yankee Technical Specifications upon receipt of your approval.

We trust you will find this information satisfactory; however, should you desire additional information, feel free to contact us.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION N

L. H. Heider Vice President Attachment COMMONWEALTH OF MASSACHUSETTS)

)ss COUNTY OF WORCESTER )

Then personally appeared before me, L. H. Heider, who, being duly sworn, did state that he is a Vice President of Vermont Yankee Nuclear Power Corporation, that he is duly authorized to execute and file the foregoing request in the name and on the behalf of Vermont Yankee Nuclear Power Corpwation, and that the statements therein are true to the best of his I knowledge and belief. l l

cMw Robert H. Groce Notary Public .

o'""" **

., My Commission Expires September 14, 1984 l

,/ ,

'C ..

n i,:s i ! W1 +p4i

, w .:

J '.

"'4 * *%

n,e