1
.pga agg j
8
- o, UNITED STATES
[
NUCLEAR REGULATORY COMMISSION g
L e
REGION lli Q,
799 ROOSEVELT ROAD D
GLEN ELLYN, ILLINOIS 60137 o
September 16, 1980 MEMORANDUM FOR:
N. C. Moseley, Director, Division of Reactor Operations Inspection, IE FROM:
' James G. Keppler, Director
SUBJECT:
INPO EVALUATION OF DRESDEN NUCLEAR POWER STATION Enclosed for your information is a copy of INP0's first evaluatic; report covering their initial inspection of the Dresden Nuclear Power St tion. The report is being made public today by Commonwealth Edison Company.
I was told the inspection was conducted by seven people, lasted nine days, and was limited to the Dresden site.
You may wish to provide copies of this report to the Commission and other NRC Offices.
hg,e James G. Kepp'idr Director I
I Enclosure :
As stated cc w/ enc 1:
V. Stello, Jr., IE R. C. DeYoung, IE Regional Directors Division Directors D. Thompson, IE W. Shafer (PAT)
S 8 *101ao g 33
n Trn
+
.,a f
1 M
I*
g' % -d'p p
w lg:
M
- :h..
In.
?ff -
!,hh,
~
l___.
g EVALUATION
,"g G
0,,,F_
D DRESDEN NUCLEAR POWER STA
- TON
^.g Mg j
Commonwealth Edison Company N
N
[E m
i l
-N f,
'W 11 C
2 w
2 j
m h
-h!
n s
)'
REPORT NO. EA 80-01 3'
September 12, 1980
.$gN N
N, J
E3
$l
[a siW IN DUPLICATE DOCUMENT VEROPERATIONS M
O MM j
natire document previously entered into system under:
l r h$
[>h 6
ANO l10 W Y$
No. or pages:
_. _.