ML19347B226
| ML19347B226 | |
| Person / Time | |
|---|---|
| Site: | Zimmer |
| Issue date: | 10/03/1980 |
| From: | Felton J NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Rigberg S AFFILIATION NOT ASSIGNED |
| References | |
| FOIA-80-446 NUDOCS 8010140060 | |
| Download: ML19347B226 (4) | |
Text
jd*""%l[o hO
)g y'
q UNIT ED STATES 2
NUCLEAR REGtRATORY COMMISSION o
$,'d
. [C WASH 8h G T ON. D. C. 20S55
/(
a,
'%,,,,, #,a -
Docket No. 358 October 3,1980 Mr. Saul Rigberg 536 Howell Avenue Apt. 3 IN RESPONSE REFER Cincinnati, OH 45220 TO F01A-80-446
Dear Mr. Rigberg:
This is in response to your letters to the Nuclear Regulatory Commission (NRC) and the Department of Energy (D0E) dated August 23, 1980 in which you requested, pursuant to the Freedom of Information Act, copies of documents pertaining to the activities of various anti and pro nuclear organizations, NRC licensing hearings for the Zimmer Nuclear Power Station, and NRC and/or Cincinnati Gas and Electric legal and/or administrative strategy (ies) and/or policy (ies).
The DOE has referred your letter to our office for direct response to you.
Enclosed, as listed in Appendix A, are documents subject to your request.
Regarding your request for documents concerning NRC operating licensing hearings and legal strategies for Zimmer, these documents have already been made publicly available at the NRC Local Public Document Room (LPDR) located at the Clearmont County Library, Third and Broadway Streets, Batavia, OH.
The purpose of the LPDR is to provide a local source of access to publicly available records relating to the Zimmer facility.
The documents you seek should be located in the " Hearing" files at the LPDR. All records in the LPDR are available for public inspection and copying.
Sincerely,
, p/h d'
/[.y.Felton, Director LD1 vision of Rules and Records Office of Administration
Enclosures:
As stated cc: ' George Weisz Department of Energy 8010140 C) Q
I RE:
F01A-80-446 APPEriDIX A 1.
PROPOSED C0f4TENTIONS SUBMITTED BY ZIMMER AREA CITIZENS - ZIMMER AREA CITIZENS OF KENTUCKY... WITH CERT OF SVC. (DATED: 5/15/80) 2.
f!0TICE OF APPEARANCE BY COUNSEL REPRESENTIf4G THE IflTERVEf!0R ZIMMER AREA CITIZENS - ZIMitER AREA CITIZENS OF KENTUCKY WITH CERT OF SVC. (DATED: 5/15/80) 3.
BRIEF Ifl 0PPOSITION TO NOTICE OF APPEAL SUBMITTED ON BEHALF 0F ZIMMER AREA CITIZENS - ZIlliiER AREA CITIZENS OF KENTUCKY PETITIONER...
WITH CERT OF SVC. (DATED: 5/19/80) 4.
CONTENTIONS ZIMMER AREA CITIZENS - ZIMf1ER AREA CITIZENS OF KENTUCKY...
WITH CERT OF SVC. (DATED: 6/13/80) 5.
LETTER FROM HOFSTADER TO KEPPLER (DATED:
12/11/78) 6.
INTERVENOR MIAMI VALLEY POWER PROJECT'S FIRST SET P' NTERROGATORIES TO APPLICANT... WITH CERT OF SVC. (DATED: 3/3/79) 7.
MIAMI VALLEY POWER PROJECT'S SUPPLEMENTARY ANSWERS TO APPLICANT'S SECOND SET OF INTERROGATORIES... (fl0TORIZED: 3/13/79) 8.
MIAMI VALLEY POWER PROJECT'S f1EMORANDUM IN OPPOSITION TO APPLICANT'S MOTION TO REQUIRE RESPONSE TO INTERR0GATORIES (DOCKETED: 3/19 /79) 9.
MIAMI VALLEY POWER PROJECT'S RESPONSE TO PROPOSED PREHEARING C0f4FERENCE SCHEDULE... WITH CERT OF SVC. (DATED: 3/15/79) 9 10.
MIAMI VALLEY POWER PROJECT'S SECOND SET OF INTERROGATORIES T0 j
APPLICANT... WITH CERT OF SVC. (DATED 3/19/79) 11.
LETTER FROM STAIGER T0 fiRC (DATED: 4/9/79) 12.
MIAMI VALLEY POWER PROJECT'S ANSWERS TO CERTAIN OF flRC'S INTERR0GATORIES...
WITH CERT OF SVC. (DATED: 5/30/80) 13.
TESTIMONY OF EDWIN P. HOFSTADTER CONCERfilflG C0flTENTION 14 RE: CABLE TRAYS WELDING (UNDATED) 14.
TESTIMONY OF THOMAS DEAN MARTIN C0f4CERNING CONTENTIONS 15 AND 16 RE:
PROCEDURES INVOLVING CONTROL RODS AND CONTROL BLADES (UNDATED) 15.
TESTIMONY OF GORMAN L. REYN0LDS CONCERNIflG PRESEflCE OF FORIGft MATTER IN CONTROL RODS (UNDATED) l 16.
LETTER FROM FELDMAN TO BECHH0EFER (DATED: 7/3/79) l
\\
l 17.
MIAMI VALLEY POWER PROJECT'S MOTION TO QUASH APPLICANT'S SUBPEONA TO D0f!ALD BLANCH... WITH CERT OF SVC. (DATED: 7/24/79)
E RE:
APPENDIX A 18.
NOTICE OF APPEARANCE OF LEWIS H. SEILER (DOCKETED: 7/25/79) 19.
NOTICE OF APPEARANCE OF TAWN A. FICHTER (DOCKETED: 7/25/79)
- 20. MIAMI VALLEY POWER PROJECT'S MOTION TO DELAY DELIVERY OF FUEL TO ZIMMER SITE... WITH CERT OF SVC. (DATED: 8/7/79) 21.
LETTER FROM GILLMAN TO BEcHH0EFER (DATED: 11/7/79)... WITH ATTACHED LETTER FROM GILLMAN TO CHAIRMAN ASLBP (DATED 11/9/79) 22.
INTERVENOR MIAMI VALLEY POWER PROJECT'S INTERR0GATORIES TO APPLICANT REGARDING CONTENTION 13... WITH CERT OF SVC. (DATED: 11/8/79) 23.
INTERVENOR MIAMI VALLEY POWER PROJECT'S MOTION TO CONTINUE THE EVIDENTIARY HEARING... WITH CERT OF SVC. (DATED 11/10/79)
- 24. MIAMI VALLEY POWER PROJECT'S OBJECTIONS TO CERTAIN OF NRC STAFF'S INTER 0GATORIES (DATED: 5/9/79)
- 25. MIAMI VALLEY POWER PROJECT'S OBJECTIONS TO CERTAI" 1F APPLICANT'S FIFTH SET OF INTERR0GATORIES AND MOTION FOR A PR0i: TIVE ORDER (DATED: 5/9/79) 26.
MIAMI VALLEY POWER PROJECT'S ANSWERS TO NRC STAFF'S INTERR0GATORIES (DATED: 5/9/79) 27.
MIAMI VALLEY POWER PROJECT'S ANSWERS TO APPLICANTS FIFTH SET OF INTERROGATORIES (DATED: 5/9/79)
- 28. MIAMI VALLEY POWER PROJECT'S MOTION TO HOLD LICENSING HEARINGS DURING EVENING HOURS (DATED: 6/8/79)... WITH ATTACHED INTERVENOR MIAMI VALLEY POWER PROJECT'S MEMORANDUM IN SUPPORT OF ITS MOTION TO ALLOW NON-ATTORNEYS TO PARTICIPATE IN THE LICENSING HEARING.
- 29. MIAMI VALLEY POWER PROJECT'S MOTION TO REOPEN DISCOVERY FOR CONTENTION 13 DEALING WITH APPLICANTS FINANCIAL ABILITIES TO BUILD AND OPERATE FACILITY (DATED: 8/24/79) 30.
MIAMI VALLEY POWER PROJECT'S MOTION FOR FULL DISCLOSURE OF BASIS ON WHICH APPLICANTS SCHEDULE AND COST ESTIMATES WERE REVISED RE:
APPLICANTS 7/30/79 ANN 0UNCEMENT ADVISING THAT LOADING WILL BE DELAYED AND COSTS WILL BE INCREASED - INF0 NEEDED FOR HEARING ON CONTENTION 13 (DATED: 8/24/79) 31.
INTERVEN0R MIAMI VALLEY POWER PROJECT'S FIRST SET OF INTER 0GATORIES TO NRC STAFF (DATED: 8/24/79) 32.
INTERVEN0R MIAMI VALLEY POWER PROJECT'S INTERR0GATORIES TO APPLICANT REGARDING CONTENTION 17... WITH CERT OF SEV. (DATED: 8/24/79)
RE:
F01A-80-446 APPENDIX A 33.
NRC STAFF RESPONSE TO INTERR0GATORIES OF MIAMI VALLEY POWER PROJECT... WITH CERT OF SVC. (DATED: 9/13/79) 34.
LETTER FROM K0SIK TO HOOPER ET. AL CONFIRMING TilAT HOFSTADER WILL TESTIFY ON BEHALF 0F MIAMI VALLEY POWER PROJECT ON CONTENTION 17 (DATED: 8/24/79) 35.
LETTER FROM CONNER TO TANTILLO RE: SERVICE OF SUBPOENA (DATED:
8/23/79)
- 36. ORDER FOR APPEARANCE OF HOFSTADER RE: MIAMI VALLEY POWER PROJECT CONTENTION 17 (DATED: 8/13/79) 37.
LETTER FROM GILLMAN TO HANAUER REQUESTING FEE SCHEDULE (DATED:
3/21/80)
- 38. MIAMI VALLEY POWER PROJECT'S MOTION FOR EVENING HEARINGS (DATED:
8/24/79) 39.
INTERVENOR MIAMI VALLEY POWER PROJECT'S OBJECTIONS TO CERTAIN OF APPLICANTS THIRD SET OF INTERR0GATORIES AND MOTION FOR A PROTECTIVE ORDER... WITH ATTACHMENTS INCLUDING CERT OF SVC. (DATED:
4/9/79) 40.
INTERVENOR MIAMI VALLEY POWER PROJECT'S MOTION TO DELAY THE OPERATING LICENSING HFARINGS AND TO EXTEND THE TIME FOR DISCOVERY,.. WITH CERT OF SVC. (Dl-
';: 4/16/79) 41.
INTLt..EN0R MIAMI VALLEY POWER PROJECT'S OPPOSITION TO APPLICANTS' MOTIG! TO DISMISS MIAMI VALLEY POWER PROJECT AS A PARTY... WITH CERT OF SVC. (DATED: 4/18/79) 42.
INTERVENOR MIAMI VALLEY POWER PROJECT'S THIRD SET OF INTERR0GATORIES TO APPLICANT... WITH ATTACHMENTS INCLUDING CERT OF SVC. (DATED:
4/20/79) i