ML19347B057

From kanterella
Jump to navigation Jump to search
Supplementary Part 21 Rept 1 Re PC-2 Installation Electrical Schematics & Instruction Books.No Other Installations Have Potential for Nearly Continuous Operation of Rocker Arm Prelube Pump
ML19347B057
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 09/12/1980
From: Moriarty J
COLT INDUSTRIES, INC.
To:
References
REF-PT21-80-237-002 NUDOCS 8010010435
Download: ML19347B057 (1)


Text

-

PART 21 IDENTIFICATibN NO,% - 237-oo T.

CU'PANY NAE Col +LIse5 DATE 0: LETTER. 4105o D32(ET NO, r >- 2:s s x

IRTE DISTRIBUED b3ho P m-ORIGilML REPORT SUPPLEENTARY )(

DISTRIBUTI0th REACTOR (R) f _

FUEL CYCE &

SAEC4MRDS (S)

FMERIALS (FD lE FIES IE FIES l

AD/ROI IE FIES AD/SG j

AD/RCI AD/ FREI AD/ROI EGIONS I,II,III,lV,V REGIGG I,II,III,IV,V REGIGG I,II,III,IV,V VEND 3R BR, R-IV VENDOR BR, R-IV VEND 3R BR, R-IV LEB / FPA l4G 5715 IFSS / FCFS SS-395 NRR/D3L AEOD FTB 7602 LEB / FPA tiB 5715 (NSS / SG SS-881 NRR/DJE AEOD tiG 7Em LDEB / FPA FIG 5715 NRR/DSI ASLBP E/W ' 450 AEOD M G 7602 SAP /SP FIG-7210A ASLBP E/W 450 -

NRR/D3L CENTPALFILES 016 CENTRAL FIES 016 ASLEP E/W 450 CENTRAL FIES ( GRDN)

CENTRAL FIES (GRON)

CENTRAL FIES 016 PDR CENTRAL FIES SS-395 CENTRAL FIES (GRQD LPDR PDR PDR TERA LPDR LPDR TEPA TERA ACTION:

)

PRELIMINARY EVALUATION OF DE' ATTACHED REPORT ItOICATES LEAD RESPONSIBILITY FOR FOLLOh'JP AS SFOhN BELOW:

lE &

NRR2 IFSS [

OTliER ]

ec ROI SG FFMSI Pa', 8/V80 80100100

~

}" costindustri 7

' g a t,, -

[

701 Lasvion Avenue Bes t. Wisconsin 536D a

acansmit September 12, 1980 Office of Inspection & Enforcement U.S. Nuclear Regulatory Comission 799 Roosevelt Road Glen Ellyn 111. 60137 Attention:

Mr. James G. Keppler, Director, Region III

Subject:

Colt Industries-Fairbanks Horse Engine Division Emergency Diesel Generators South Carolina Electric & Gas Co.-Su!nmer Station Part 21 Report-Possible Improper Rocker Arni Prelube Pump Operatton Supplemental Report sF1 Gentlemen:

We have completed our review of other PC-2 installation electrical schematics and instruction books as indicated in our June 27, 1980 report.

None of the other installations have the potential for nearly continuous operation of the rocker arm prelube pump as the units at Sumer Station.

Very truly yours,'

0

PA)

J riarty HANAGER UTILI g 1ES J W jl ec:

U.S. Nuclear Regulatory Comission c/o Document Management Branch Washington, D.C. 20555 iSEP 1 5 ca A anmen a one con m % cm, 4

e e

e I