Informs of Review of Matl Re License Renewal at Beatty Low Level Waste Burial Site.Matl Does Not Present Any Significant New Info Re Rd Smith 800703 Memorandum.Table Outlining Major Concerns Re Site Stabilization Encl
ML19347B012
Person / Time
Issue date: 08/08/1980
From: Rich Smith
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Kerr G
NRC OFFICE OF STATE PROGRAMS (OSP)
Shared Package
ML19347B013 List:
References
REF-WM-8 NUDOCS 8010010165
Download: ML19347B012 (3)


Text

1 AUG 8 Jagg Distribution: WM-80-262 NMSS r/f REBrowning WM r/f JBMartin WMLL s/f NGill WMLL r/f JShaffner EFHawkins RDSmith IE10RAilDUM FOR:

G. Wayne Kerr, Assistant Director gar State Agreements Program Office of State Programs FROM:

R. Dale Smith, Chief Low-Level Waste Licensing Branch Division of Waste Management

SUBJECT:

REVIEW 0F ADDITIONAL IllFORMATION PROVIDED BY NECO RE: LICENSE RENEHAL AT BEATTY LOW-LEVEL WASTE BURIAL SITE We have reviewed the material you forwarded concerning the Beatty site via your July 22, 1980 memorandum, and conclude that the material does not present any significant new information that addresses the major concerns expressed in my memorandum to you dated July 3, 1980.

Our cursory review of the material indicates that the only new information is the documentation of a few work procedures regarding waste handling.

Otherwise, no licensing conditions have been added or significantly modified thte would address the issues mentioned in the July 3,1980 memorandum. One of our major concerns, for instance, is that NECO has made no real attempt to address their comitment to proper site stabilization and closure, either in the licensing conditions or the appended materials.

I have attached a table outlining our major concerns and a brief indication of how NECO's latest submittal does or does not address those concerns.

This review was perfonned by Jim Shaffner of my staff.

R. Dale Smith Low-Level Maste Licensing Branch

Enclosure:

As stated 8010010 /6 6 l

8/6/80 gc

!.~.

jf R!LL.E SMLL.

.... MklN,j.

W oy.cc ).JShaf,fnehchEFHawkins RDSmith suaN.Me) oare )..8/../80.

.p..Cl. # 0 l.2/?"

.l.

MAC FOAM 318 (9 76) N ACM 0240 DU.S. 3CVERNMENT PRIN fiNG OF FICL M79 29') 369

[%

o MAJOR CONCERNS WITH ORIGINAL APPLICATION FOR RENEWAL ADEQUACY OF RECENT SUBMITTAL Does Not Site Suitability & Design Address Addresses In

- Lack of Up-to-date Site Information X

- Failure to document existing procedures X

- Lack of Geotechnical & Environmental Data X

- Failure to develop technical specifications for site design X

Waste Form

- Lack of consistent TRU definition X

- Cutoff date for receipt of liquid scintillation wastes X

- Requirements regarding free standing water in waste X

- Committment to solidification of resins and filter material

?

Waste Receiot

- Need for some supplemental specifications 5

Operations

- Need for additional information on buffer X

- Information on trench caps X

- Separation of chelating agents X

- Deeper burial of highly radioactive material X

Monitoring X

Accidents 5

4 Site Closure & Stabilization

- Continuing operator responsibility X

- Funding Mechanism X

- Closure Objectives 6

- Commitment to deve10pment of a comprehensive plan X

Ch s

l LIST OF MATERIAL SUBMITTED TO WEVAC% DIVISION OF HEALTH VIA JUNE 13th LETTER 1.

Licensing conditions - no substantive changes 2.

List of monitoring instruments - added one piece of equipment 3.

Work procedures.on operator training s

4.

Chapter 12 - respiratory protection for safety manual.

5.

Added work procedures BN-006 - Security Program BN-010 - Package Inspections BN-Oll - Overpacking BN-012 - Solidification of Liquids BN-013 - Decontamination BN-014 - Onergency Preparedness T-001 - Modification of Solidification Building 6/ Discussion of Site Closure & Stabilization (Note: This material looks like it was prepared by NRC.

It does not provide any indication as to how NEC0 plans to meet the objectives brought forth i

in the document.)

-