ML19347A940
| ML19347A940 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 08/26/1980 |
| From: | Oprea G HOUSTON LIGHTING & POWER CO. |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| IEB-80-19, ST-HL-AE-518, NUDOCS 8009300555 | |
| Download: ML19347A940 (2) | |
Text
T/C Tho Light Company a-nuem a-er m mam a-aeus - mi < i3> 22s.92ii August 26, 1980 ST-HL-AE-518 SFN:
V-0540 Mr. Karl Seyfrit Directo', Region IV Nuclear Regulatory Comission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
Dear Mr. Seyfrit:
South Texas Project Units 1&2 Docket Nos. STN 50-498, STN 50-499 IE Bulletin No. 80-19 Bulletin No. 80-19, received August 6, 1980, has been reviewed by Houston Lighting & Power Company.
As required by the Bullctin, South Texas Project systems have been reviewed to detemine whether mercury-wetted relays are used in the STP reactor protection system (RPS).
As a result of this review, HL&P has detemined that the STP RPS does not include mercury-wetted relays; therefore, this Bulletin does not affect the South Texas Project.
Manpower expenditures in responding to this Bulletin, including prorated i
work done on a generic basis, were approximately 8 man-hours.
If you have any questions, please contact Mr. L. R. Jacobi at (713) 481-7217.
Very trttly yours,
f.]/,n'
,/
/'
,n
/.
6.N.
- rea, ri Exec tive V President PLW/pjb 8000300555
Houston ti5 huns & Ptner Compey August 26, 1980 ST-HL-AE-518 SFN: V-0540 R
Page 2 Director, Division cf Reactor Operations Inspection cc:
Office of Inspection and Enforcement Nuclear Regulatory Commission M. D. Schwarz (Baker & Botts)
R.GordonGooch(Baker &Botts)
J. R. Newman (Lowenstein, Newman, Reis, Axelrad & Toll)
D. G. Barker A. J. Granger R. A. Frazar G. B. Painter R. L. Waldrop H.
R.~ Dean C. L. McNeese 1
f gp e
e-=
w