Discusses Draft Gao Rept, Proposed Interim Consolidation of Nrc. Agrees That Scattered Physical Locations Seriously Affect NRC Operations.Omb Suggestion Preferable to Gao Plan
ML19347A793
Person / Time
Issue date: 09/03/1980
From: Ahearne J
NRC COMMISSION (OCM)
To: Peach J
GENERAL ACCOUNTING OFFICE
References
NUDOCS 8009300250
Download: ML19347A793 (2)


Text

t 7 f *%

[2f g

./, [qh. 'A t

UNITED STATES

^

3 R

NUCLEAR REGULATORY COMMISSION

  • h,o () j E l

WASHIN GTON, D.C. 20555 C

0 September 3,1980 gg CFFICE OF THE CHAIRMAN Mr. J. Dexter Peach Director, Energy and Minerals Division U.S. General Accounting Office Washington, D.C.

20548

Dear Mr. Peach:

We have ~ reviewed the draft GA0 report, " Proposed Interim Consolidation of the NRC," and agree with the conclusion that NRC's scattered physical locations seriously affect NRC operations.

We continue to maintain, however, that the OMB proposed interim consolidation plan, which would relocate half the agency in the Matomic Building and half in Bethesda, is the only acceptable short-term solution identified to date. This plan would significantly reduce two existing problems of Commission interaction with its staff and the coordination of numerous staff offices with each other.

The proposed alternative plan suggested by GAO, however, would only marginally address the first of these probl ems. Moreover, by merely reshuffling the agency within the currently dispersed configuration, the GA0 plan would leave the NRC scattered in five different locations.

In contrast, the OMB plan provides for substantial consolidation in two locations.

Since the GA0 alternative would not improve our dispersal problem, we feel strongly that the agency should not go forwa-d with this alternative.

With regard to the difference in costs of the alternatives, it is important to note two points.

First, the $500,000 estimate for the GA0 alternative is low since~ it does not take account of the extensive alterations which would be required to meet the Commission's special needs, such as public hearing rocrns and security. arrangements.

Second, we estimate that under the OMB proposal the agency would save one million dolla.rs a year in administrative costs by consoli-dating in two locations. Thus, over a five-year period, which is the shortest possible time before a permanent building could be ready, the savings would be enough to offset the initial cost difference.

These savings would not be realized under the GAO proposal.

In sumary, the Commission is concerned that the GA0 repcrt could create the false impression that either of the proposed alternatives is acceptable.

To the contrary, the GA0 alternative does nothing to solve the current state of dispersal and as such is unacceptable.

We have to emphasize that it is we who are given the responsibility of managing this agency to assure safe nuclear power.

We have pointed out for years the need to deal with the chaotic housing pattern of the agency.

It was only after the accident at Three Mile Island

)

8009300250 l

1

i.*.

J a

J. Dexter Peach September 3, 1980

/

that we received general recognition of the need to assist us with our problem.

If we lose this opportunity that is presented to us in the fom of the OMB proposal, it will be extremely unfortunate, not only for us in our abilities to manage and control this agency, but more significantly for the adverse impact of this loss on our ability to assure safe nuclear power.

Sinc

ely,

,/

J hn F. Ahearne Chairman an A