ML19346A284
| ML19346A284 | |
| Person / Time | |
|---|---|
| Site: | Columbia, Diablo Canyon, San Onofre, Humboldt Bay, Rancho Seco, Trojan |
| Issue date: | 04/30/1981 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19346A285 | List: |
| References | |
| IEC-81-04, IEC-81-4, NUDOCS 8106190010 | |
| Download: ML19346A284 (1) | |
Text
_
/
'o -
UNITED STATES 85 i
NUCLEAR REGULATORY COMMISSION
$ /-
REGION V
-0 1990 N. CALIFORNIA BOULEVARD SulTE 202, WAe. NUT CREEK PLAZA
.[
/
h WALNUT CREEK, CALIFORNIA 94596
{,
'I IS8Ih
(
uI,','
M d' @
April 30,1981 cc q.
t,
NOTE T0: ALL TFOSE ON IE CIRCULAR DISTRIBUTION LIST I%
FROM:
IE, REGION V
SUBJECT:
IE CIRCULAR N0. 81-04: THE ROLE OF SHIFT TECHNICAL ADVISORS AND IMPORTANCE OF REPORTING OPERATIONAL EVENTS The' attached IE Circular No. 81-04 was issued this date to the following licensees:
1.
Pacific Gas &' Electric Company (Humboldt Bay Unit 3, Diablo Canyon Unit 1, Docket Nos. 50-133 & 50-275).
' 2.
Portland General Electric Company (Trojan, Docket No. 50-344).
3.
Sacramento Municipal Utility District (Rancho Seco, Docket No. 50-312).
4.
Southern California Edison Company (San Onofre Units 1 & 2, Docket Nos. 50-206 & 50-361).
5.
Washington Public Power Supply System (WNP-2, Docket No. 50-397).
Region V has made distribution to the Accessions Unit for the PDR, LPDR, NSIC and TIC.
Enclosures:
1.
Transmittal Letter 2.
IE Circular No. 81-04 r8110619 0 010 k
_