Advises That Description of Emergency Response Facilities Will Be Sent Upon Determination of Applicable Requirements of HTGR to Facility by 810701.Requirements for Emergency Response Facilities Contained in NUREG-0696 Under Review
ML19346A186
Person / Time
Site: Fort Saint Vrain 
Issue date: 06/01/1981
From: Justin Fuller
PUBLIC SERVICE CO. OF COLORADO
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0696, RTR-NUREG-696 P-81159, NUDOCS 8106050349
Download: ML19346A186 (2)


Text

.

l Public service company oe cdlendo 12015 East 46th Avenue, Suite 440; Denve;, CO 80239

-O 3 A G[F

,' h* o.

^

/D V,'"%

.3 June 1, 1981 IT %.y' '

'k Fort St. Vrain i

Unit No. 1

{8 -

2. "/j,U'O

'l

'N

/

i P-81159

.]

9'by' f

'~~

(0-267 Mr. Darrel G. Eisenhut, Director Division of Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Emergency Response Facilities

Dear Mr. Eisenhut:

Public Service Company of Colorado (PSC) is presently reviewing the requirements for the Emergency Response Facil-ities (ERF) contained in NUREG-0696, various Regulatory Guides and other applicable documents based upon the in-fonnation obtained during the NRC Meeting held in Atlanta May 8,1981, as they may apply to the Fort St. Vrain Nuclear Generating Station.

l Because Fort St. Vrain utilizes a High Temperture Gas Reac-tor (HTGR) and not a Light Water Reactor (LWR), it is neces-sary to evaluate each requirement contained in the subject documents to detennine their applicability to an HTGR.

These evaluations will be based upon the inherent diff-l erences between the LWR and HTGR and the potential impact of i

postulated accidents on the safety of the public as they specifically relate to the Fort St. Vrain facility.

Because of the late date on which the Atlanta meeting was held with respect to the June 1,1981 submittal date and because an evaluation must be made of each requirements ap-plicability to an HTGR, PSC will not be able to submit the l

description of the ERF on June 1,1981, as scheduled by the A

i

[f044 NRC.

l

.s,

//0 l

g1060 50 3d

/)

i

E P-81159 Page 2 June 1, 1981 PSC intends to submit the description of the ERF based upon determination of the applicable requirements to the HTGR and

-t Fort St. Vrain by July 1, 1981.

Very truly yours,.

J. e. Fed &~ $ - ll x

J. K. Fuller, Vice. President Engineering and Planning JKF/FES:pa 4