ML19345H574

From kanterella
Jump to navigation Jump to search
Intervenors List of Documents to Be Offered Into Evidence Per Stipulation.Certificate of Svc Encl.Related Correspondence
ML19345H574
Person / Time
Site: Vallecitos File:GEH Hitachi icon.png
Issue date: 05/12/1981
From: Cady G
CADY, G.W.
To:
References
ISSUANCES-SC, NUDOCS 8105210284
Download: ML19345H574 (5)


Text

O o,

8 j

REuTED CORRESPONDENCEe 8-IW 201981., t2 UNITED STATES OF AMERICA B-MAY1 5gggg, C u.s 4

$;NUCLEARREGULATORYCOMMISSION {b Offe, er g

.w i

p

%44 x

\\

Sra on sP

\\

g w

In ter of

)

i p

)

Docket No. 50-70 GENERAL ELECTRIC COMPANY

)

)

Operating Licente (Vallecitos Nuclear Center -

)

No. TR-1 General Electric Test Reactor)

)

(Show Cause)

DOCUMENTS PROPOSED TO BE ADMITTED INTO EVIDENCE Pursuant to section 2.743 and the Stipulation entered into by the parties relative t:, list of exhibits (documents) which they intend to offer into evidence, Intervenors intend to introduce into avidence the following exhibits (documents) :

1.

the original map and report by Darrell Herd in 1977 that revealed the existence of the Verona Fault close to the GETR; 2.

the written comments and reports by USGS scientists regarding the Vallecitos site prior to the 1977 shutdown of the

. GETR, including t?.a USGS input in the NRC Staff SER in 1959 and 1980; 3.

all NRC Staff reports regarding. seismic and geo-l logic factors at the Vallecitos site since the beginning of the site review in 1977, including the Staff SER inputs from the NRC Geosciences Branch dated 1977, 1978, 1979 and 1980; 4.

a memorandum to the Chief of the Geosciences Branch dated October 20 or 26, 1977, from an NRC Staff Geo-physicist from the Geosciences Branch, John Kelleher, regarding the GETR Nuclear Facility;

...D503

y..

h 820321oggq

)

.~

' 4 5.

NRC Geosciences Branch SER of May, 1980; 6.

the SER Input of October,1979; 7.

a report entitled " Seismic Gaps and Plate Tec-tonics:

Seismic Potential for Major Plate Boundaries" by Mc-Cann, Nishenko, Sykes and Krause:

in Transactions, American Geophysical Union, Fall Meeting, 1978; 8.

a report entitled " Origin of the Seismic Gap:

What Initiates and Stops a Rupture Propagation Along a Plate Boundary?" by Keiiti Aki, MIT, June, 1978; 9.

" Continental Drift and Plate Tectonics" by

... iam Glen, College of San Mateo, by C. E. Merrill Publish-t ing Co., 1975; 10.

" Processed Data from the Stong-Motion Records of the Santa Barbara Earthquake of August 13, 1979", three volumes, by the California Division of Mines and Geology, Special Report, No. 144; 11.

" Engineering Features of the Santa Barbara Earth-quake of August 13, 1978" by Richard K. Miller and S. F.

Felszeghy, published by the Earthquake Engineering Research Institute in December, 1978; 12.

"The Greenville Earthquake Sequence of January, 1980", by Bruce Bolt, T. V. McEvilly, and R. A. Uhrhammer, from the University of Californin at Berkeley, Seismographic Station; 13.

" Peace of Mind in Earthquake Country" by Peter Yanev, by Chronicle Books, San Francisco, 1974; 14.

the transcripts of the ACRS meetings regarding the GETR in 1979 and 1980;

. ~...

15.

" Seismicity of the Livermore Valley in Relation to the General Electric Vallecitos Plant", by Bruce Bolt and Roger Hansen, March, 1980; 16.

a chapter from the " Methods of Dynamic Analysis for Structural Design" by Garrison Coast of EDAC, a chapter pertaining to " uncertainties in seismic analysis";

17.

a published interview of Bruce Bolt and Thomas McEvilly, by Fred Garretson entitled " Quake Aimed at Livermore Lab", published by the Oakland Tribune on January 26, 1980; and 18.

an article by the NRC Staff seismologist Leon Leiter entitled "Needs of the NRC in the Field of Strong.

Motion Seismology", dated February, 1978.

M GLENN W.

CADY, Attorney for Intervenors Dated this 12th day of May,1981 in Lafayette, California

=

.@TE.D CORRESPONDENCE 4

C D D E7to b

UNITED STATES OF AMERICA g

usue

-i 2

MAY 151981. O NUCLEAR REGULATORY COMMISSION c-

-21 In the Matter of

)

)

Docket No. 50-7 GENERAL ELECTRIC COMPANY

)

)

Operating License (Vallecitos Nuclear Center -

)

No. TR-1 General Electric Test Reactor)

)

(Show Cause)

CERTIFICATE OF SERVICE I hereby certify that copies of Intervenors DOCUMENTS PROPOSED TO BE ADMITTED INTO EVIDENCE in the above-captioned proceeding have been served on the following by deposit in the United States mail, first class, this 12th day of May, 1981:

Herbert Grossman, Esq., Chairman Honorable Phillip Burton Administrative Judge ATTN:

Mary Atomic Safety and Licensing Board 2454 Rayburn House Office Bldg.

U.S. Nuclear Regulatory Commission Washington, D.C.

20515 Washington, D.C.

20555 George Edgar, Esq.

Dr. George A. Ferguson Morgan, Lewis & Bockius Administrative Judge.

1800 M Street, N.W.

School of Engineering Washington, D.C.

20036 Howard University 2300 6th Street, N.W.

Jed Somit, Esq.

Washington, D.C.

20059 100 Bush Street, Suite 304 San Francisco, California 94104 Dr. Harry Foreman Administrative Judge Edward A.

Firestone, Esq.

Box 395, Mayo General Electric Company University of Minnesota Nuclear Energy Divisions Minneapolis, MN 554SS 175 Curtner Avenue San Jose, California 95125 Honorable Ronald V. Dellums (Mail Code 822)

ATTN:

H. Lee Halterman 201 - 13th Street, Room 105 Richard G. Bachmann, Esq.

.sakland, California 94617 U.S. Nuclear Regulatory Commission Washingtos, D.C.

20555 Ms. Barbara Shockley 1890 Bockman Road Honorable John L. Burton San Lorenzo, California 94590 1714 Longworth House Office Bldg.

Washington, D.C.

20515 l

t

Atomic Safety and Licensing Docketing and Service Section Board Panel Office of the Secretary U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C.

20?A Washington, D.C.

20555 Atomic Safety and Lisnsing Appeal Panel U.S. Nuclear Regulatory Commission Washington, D.C.

20555 i

)

A %1 ~

GLENN W. CADY, Attorney fo j

Intervenors l

i t

W f

I

,..... - -,, - -.. - - -, - - - -...,.. -., - -....,. -. ~.,.... -. _..,,....,.,. -,,.... ~. -...,... - -.

. _. ~ _. -... - - - -.,...