.Oi JOSEPH M. FARLEY NUCLEAR PLAhT UNIT 1 NARRATIVE SU? DIARY OF OPERATIONS 3
APRIL, 1981 i
In the month of April, 1981, there were four (4) power reductions, two (2) manual shutdowns from flode 2 (one continued from 3/31/81), and two (2) manual shutdowns from Mode 1.
The following safety-related maintenance was performed in April:
1.
Performed miscellaneous maintenance on Diesel Generators.
2.
Repaired flange leaks on RCS loops A and B RTD manifolds.
e g
i m
r i
1 i
g105210f6E
... -... -... L : z :2 -..
-...-.,.-. - -... -. -. = _,
OPERATING DATA REPORT DOCKET NO. 50-348 DATE 5/1/61 CO31PLETED BY W.G.Hanston, III TELEPHONE (zu3)S99 5156 OPERATING STATUS
~
Josech M. Farley - Unit 1 Notes (1) Cumulative data
- 1. Unit Name:
- 2. Reporting Period:
Aoril, 1981 since 12/1/77, date of
- 3. Licensed Thermal Power (5fWt): 2652 camercial operation.
- 4. Nameplate Rating (Gross alWe):
860 S. Design Electrical Rating (Net SIWE):
829
- 6. afaximum Dependable Capacity (Gross 31We):
844.6
- 7. Siaximum Dependable Capacity (Net 5tWe):
803.6
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report. Give Reasonsr N/A
- 9. Power Levtl To Which Restricted. If Any (Net afwe).
N/A
- 10. Reasons For Restrictions.If Any:
N/A
- ~(
This 5fonth Yr..to-Date Cumulative
- 11. Hours in Reporting Period 719 2,879 29,927
- 12. Number Of Hours Reactor Was Critical 605.6 710.1 17,892.4
- 13. Reactor Reserve Shutdown Hours 113.4 296.8
'2,743.6
- 14. Hours Genentor On-Line 565.5 565.5 17,266.9
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Genented (SiWH) 1.134.435.5 1.134.435.5 43,124,327.3 l -
- 17. Gross Electrical Energy Genented (31WH) 360.936 360.936 13,780,344 I
IS. Net Electrical Energy Genented (31WH) 334.106 310,160 12,917,910
- 19. Unit Service Factor 78.7 19.6 57.7
- 20. Unit Availability Factor 78.7 19.6 57.7
- 21. Unit Capacity Factor (Using 3tDC Net) -
57.8 13.4 53.7
- 22. Unit Capacity Factor (Using DE11 Net) 56.1 13.0 52.1
- 23. Unit Forced Outage Rate 08.7 07.1 04.7
- 24. Shutdowns Scheduled Over Next 6 Stonths (Type. Date.and. Duration of Eacht:
N/A 2S. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Opention):
Forecast Achieved INITIAL CRITICALITY 8/6/77 8_j9/77 l (
INITIAL ELECTRICITY 8/20/77 8/18/77 COM31ERCIAL OPERATION 12/1/77 12/1/77 tuf;7)
n DOCKET NO. 50-348 p),
UNIT 1
DATE 5/1/81 COMPLE'GD SY W.G.Hairsten, III
/
Tid.EPHONE. (205)899-5156 SiONTH April, 1981 DAY AVERAGE DAILY POWER LEVEL
- DAY AYERAGE DAIL POWER LEVEL (MWe-Net)
(MWe Net)
, 579-g, 37 2 427 jg 4
3 10 g,
595 '
4 329 772 aa S
'340 787 21 6
347 790
. 22 g.g 397-792 7
3 454 24 796 9
453 790
~
25-10 453
~~- - u 765 11 456 27, 798 T7 12 - ; 3 805
~.
13 806 3
802 1
g4 ' -
30 IS EO
- 33 16 407 l
i e
DtSTRL'CI;0NS On this form:t.litt the aver:ge hily unit power !=velin MWe-Net for ::ch by is the repomng menth. Compute to the neste:t whole meg: watt.
e e.
e O'",
-- +
(9p7) e
~
-m e
.m e-a
_ me-eme - e w
^.eN em ee.w e
e-***e.
w.
w-
,i.-.
g.-
,---.-,w,-.-
y%yy-w-y-ng_t m,y-n,,-..,--,.
p g,.., - -~,
_,%y
..e._,--.-.__-,,g.-wyw--g a w-.yw-r
{
l UNITSIIUTHOWNS AND POWER REDUCDONS DOCKET NO. 50-348 UNIT N AME J.M.Farley-thit 3 i
C
].Ill REPORT MON 1lI. April, 1981 "L
'5 u. 3 5 'l.
Cause & Cossccijve c
ri
.E _e 8
m.5 y l_icensee g s, ga No.
Date g
3g
,g g a Event u?
- n. "
Action to
$6 gU Mcpost #
h pfCVent $cynf tence d
005 810401 F
8.0 A
1 N/A IIB TUGIN Unit outage continued fran 3/31/81 due to SGFP 1A failing overspeed trip test 006 810401 F
58.5 A
1 N/A IIA TURBIN Unit manually shutdown in Mode 2 to investigate Main Turbine #6 bearing overtanperature condition.
007 810404 S
0 B
4 N/A RC ZZZZZZ Unit held at 390 FW for physics testing 008 810407 F
0 A
4 N/A IIB TURBIN Unit held at 500 FW due to SGFP 1A tagged out for maintenarice.
l 009 810412 S
85.4 B
1 N/A IIB TURBIN Unit manually shutdown to ramve blank flange in steam supply ifne to SCFP 1A and conduct testing on SGFP 1A.
l 2
3 4
F: Foiced Reason:
Method:
Exhibie G Instructius S: St heduled A Ceguipment Failure (Empi,ain) 1 Manual for P4epasation of Data 11 Maintenance oi Test 2 Manual Scram.
lini:y Slicens for Licensee.
C.ltefucting 3-Automatic Scram.
Evens Repois (i.ER) File (NtlRl!G-D Regul,ato y Ressaiction 4-Othes (lixplain) 0161) li Opesatos Tsaining & t.icense lixamination F Adminisseaiive 5
- G-Opesailonal liinu (limplain) lixhibit I Same Somce 19/U) 11 Othge (!!xplain)
t O
D)
O _.
DOCKET NO. 50-348 UNIT Silull> OWNS ANI) POWER REDUCI10NS i
l UNIT NAME J.M.Farlev-Unit l DATE TI7BI ~
COMPl.E1ED llY W.G.IIairston. III REPORTMONTil _ April.1981 TELErilONE (255TB99-5156 v.
E c
.! E
.E E 1.icensee E **
h Causc & Corrective q,
No.
1).ite Q
3g jg5 Event gg stl Action to
$6 3$c itcpost #
ad U hU l*sevcul l<cyussence b
g u
e o
010 810417 S
0 B
4 N/A RC ZZZZZZ Unit held at 640 FN for physics test-ing.
011 810418 S
0 B
4 N/A IIA VALVEX Unit reduced to and held at 607 FM for Main Turbine governor valve test-ing.
- s 012 810418 F
1.6 A
1 N/A IIA VALVEX Unit manually shutdown due to problems with the Main Turbine Digital Electro-liydraulic Control (DEllC) systen.
- 1 i
i p
I 2
3 4
12: l'osced Itca>on:
Method:
Exhibit G Instructions S: Scheduled A liquipmens Faihne(Explain) 1-Manual for Picpasation of D.isa ll. Maintenance of Test 2 Manual Scram.
Entey Slieces for tiensee C Itefuchng 3 Automatic Scram.
Evens Itepost (t Elt) File (NilREG-D Regulatory itesisiction 1-Othes (lixplain) 0161) 1:.-Opesator Tsaining A 1.icense lixamination F-Administ sative 5
G Opesasional liiroi (Explain)
Exhibit I Same Source PJ/77) 11 Othes (Explaini