...r OPERATING DATA REl' ORT DOCKET NO. 50-336 DATE UD/ UU/ 0 '
COMPLiv9 By G. it. howlett TEltfilONE (203)W 791 X364 OPER ATING ST ATUS llillstone Unit 2 Notes
- 1. Unit Nime:
Aprii 19/9 Items 21 & 22
- 2. Reporting Period:
UOO
- 3. Licensed Thermal Power Olbt):
Cumulative, are comp 0ted'
- 4. Nameplate Ra'ing (Gross MWe):
909 using a weighted average.
- 5. Desi;n E!cetrical Ratin; # Net MWe):
870 895
- 6. Maximum Dependable Capacity (Gross MWel:
864
- 7. Maximum Dependable Capacity tNet MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
lione 000
- 9. Power Lesel To Which Restricted.If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
Nono
~
~
' This Month Yr. to Date Cumuhtive -
- 11. Ilours In Reporting Period 719 2.879 46,871
"~
' ' 12. Number Of IIours Reactor Was Critical 719 2,459.5 33,708.8 0
0 2,076.9.
- 13. Reactor Resene Shutdown llours
- 14. Ilours Generator On Line 719 d'
M 'I94*#
- 15. Unit Reserve Shutdown flours 0
0 408.2-
- 16. Gross Thermal Energy Generated (MWil) 1,934,118 6,469,427 79,704,748 635,610 2,138,060 25,810,977
- 17. Gross Electrical Energy Generated (MWil) b l 3,4 F _,
2,059,443 24,721.489
- 18. Net Electrical Energy Generated (Mhli)
I 68./
- 19. Unit Senice Factor Rd 7
- 20. Unit Aoi! ability Factor 100.0 84.2 69.7
- 21. Unit Capacity Factor (thing MDC Net) 98.8 82.8 63.7 98.1 82.2 62.5
- 22. Unit Capacity Factor (Using DER Net) 0 15.8 22.2 l
- 23. Uni. Forced Outage Rate l
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date.and Duration of Eacht:
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: J!^
r
- 26. Units in Test S:3.us(Prior to Commercial Operation):
Forecast Achiesed l
INIYl.% L CRITICAL.lTY NA NA IIA IIA l
INITIAL El.ECIRICIIY COMM ERCIA L OP!:R ATION
- 8105 'Sb o 22l 00R 01 (W77)
A\\TR 4GE D AILY L* NIT NbER LEVEL DOCKET No. _50-336 fif11stonef UNIT DATE _05/08/81 CO.fPLETED BY.6 H. if0Wiett
\\
IR031447-1791 X364 TELEPHONE Q
I l9dI
.i!ONTil DAY AVER AGE DAILY POWER LEVEL DAY (MWNet)
AVERAGE DAILYPOWER LEVEL
(.\\fwe Nei) 859 37 857 2
858 gg 856 859 3
9 855 4
858 20 855 5
Rs7 21 855 6
856 22 855 857 7
"64 8
857 857
~
'24 H53 p
856 25 gg3 to 26 852 j;
816 27 852 12 844 28 852 33 844 l
29 851 l
14 856 30 851 15 856 31 16 848 INSTRUCTIONS
' k '! i" Ih*' Nel for each day in the :eponin; :n. r.th. Compuie o
"' P
),$1 :r 1 res a
+
1907:
Il a
50-336 UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
'IlA8 SLO W d I
UNIT NAME DATE Ub/ ud/ d l
{
REPORTMONTH April 1981 COMPLETED BY G. ti. Howlett TELEPl!ONE (203)d37-1741 X3b4
~.
- 3. 5 e
=
r.
. No.
Date f _$
{ }"
g Q
Cause & Corrective nt
^""I" Report
- iES ES
$E cE
~ g =g Prevent Recurrence g
e Q
9 e
4 e
C"3 C=3
- C
~9 c-M r- -
e Sumary: The. unit operated at o'r near 1001, of rated thermal power throtighout the reporting period.
D S
(9/77)
- l
j PageI cf i
~~
Dage
- s. 1-si Unit Name
- 411 stone 2 1
i Completed By G. H. Howlett Telephone
( m )% /-i./91 A364 j
CORRECTIVE MAINTENANCE SUFF.ARY FOR SAFETY RELATED EQUIPMENT March Report Month iTE SYSTEM COMPONENT MAINTENANCE ACTION
- 13/05/81 Chemical i Volume Boric Acid Pump, P-19A.
Rebuilt pump.
Control
- 13/17/81 120 Volt Vital inverter,Inv-l Replaced frequency.
Instrument A.C.
- 13/19/81 Chemical & Volume
. Changing Pump P-18C Replaced plungers and repacked pump..
Control 13/20/81 Auxiliary Feedwater Turbine uriven Auxiliary Feed Repacked pump, See LER 81-14/360 13/ 81 Various Mechanical Snubbers See LER 81-ll/3L-0 e
e 9
4 o
i 4
=
Docket No.
50-336 l
Date:
Li d l M 981 Completedly: G.ll._llowlett III Telephone:
203/447-1971 X361 s
REFUELING INF0PRATION REQUEST 1.
Name of facility:
Millstone 2 2.
Scheduled date for next refueling shutdown:
Commenced refuel outage December 5,1981.
3.
Schedule date for restart following refueling: January 23, 1982 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
It is expected that Cycle 5 operations will require Technical Specification changes.
5.
Scheduled date(s) for submitting licensing action and supportirg information:
Licensing documentation will be provided a minimum of 9D days prior to start-up of Cycle 5 or as documented in the R.A. Clark letter to W.G. Counsil, dated 10/6/80, authorizing Cycle 4 operation.
6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
In Core:
217 (b) 216 8.
The present licensed spent fud pool storage capacity and the size of any l
increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
667 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1985, Spent Fuel Pool, full core off load capability is reached.
1987, Core Full, Spent Fuel Pool contains 648 bundles.