Forwards Applicant Proposed Schedule for Further Proceedings & Response to Joint Intervenors' Contention 2.Certificate of Svc Encl
ML19345G585
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/25/1981
From: Baxter T
SHAW, PITTMAN, POTTS & TROWBRIDGE
To: Bright G, Gleason J, Kline J
Atomic Safety and Licensing Board Panel
Shared Package
ML19345G586 List:
References
ISSUANCES-OL, NUDOCS 8104070561
Download: ML19345G585 (7)


Text

.

SHAw. PrrTMAN. PoTTs & TROWBRIDGE 18 00 M ST A CET, N. W.

WASHINGTON. D.c. 2CO3 6 Ea M S ay o,poTTs' Maflas r. fmavicso.oia2 ;3o2! e22.ao co crcuant L eer wam vicromen s. econnus -

otomot a.Taowensoot sown w. o*= cia.sa.

STcpwcN o. POTTs saf a. Casti cN vgggggpagg simaw cwammorr mano L auts amtum o. sostwica rimorav e mesmiec aozi era.ioes a saa.nso e:timetwv wammu cusaacTw a pcm o6ctom -

eccoot m. moocas.sse. u.cv 2. cuasor raro A.uffic paul a.maptan ggggx

,o m e.awinstamore mammv w. stasspecocL LeuCc W. Cwuncatu. sammak 8. s cLL Q i.e.2 Sea i swawLaw wsal u:su c 4. wiewoLaon.sa. tuomas a wecon=ics i i- r cs-warma o. npau sussaw o.raLasom / ,,

,. \ castt'sNa*u ""

meewamo J.achoaLL say c. sisacao

  • WaaM p samm susam u. recuno j\/ \f s

g'%q \ _

cowamo e.cmosumo cansana w.mossorts otomo e v. sacu. sa.

wann scwukrz sonu L camm.sm.

SMIUS J.wamvcv

.i.;/

,,e.rf,'.S, e'

y CouNscL mu. Smacromo acTNoLos  % <w .. .p, Faco omassen moscaru.oomoom ,; 3. -a ' _

marwamist a ensco.sa. s caust a. c460cnow . 9 -.M . ,,

mama avocneuen saneana s. womotu

-qQMC4  :. ametsm s oince? osak numeca ermcs? L sun e.sm.

camLcTom s.soucs soumic s.corruce atenco w. posrci.:.

acwano n. swarremmam

.. ,Q ei

,- . , ..., r - . r g

8?

7 \ g..A, 's .j / 0;.

twomas a. saarca i sauts u. eumata cracmaw L essastria &8 '/

sucLoom J. wrisch scoff 4.4mcNecmo .

' ,f= . /  % J- ~ ,

sem w.woooassau s/ -

ao=N a. mec.uuovow

s. marmica . ica cy otomac s. usc=acLv. so.

suc La c. mecaracary ecussa a.miooway ,,

j g [ \gf *

.1%

iiV*a g &g ;

O.

James tuomas tsuman? E cNNcTw J. wau7Mam ,/ ',

s%cn 6 wctrzca cavio 64wacNCE MtLLem '

  • Ngg/-

. =J iW .. .,*

oram c.auuca .ANNc M.MeausRopr , Q g, , - M ~.# ,, , , .

recorpsen LaLom a

  • son = cuott sicawcm e.wur? Lcm..

wiu amosm.emown aemoom m. namorsav sauf c.amoscws l 5 ~1

-1 *s,;

h e p Q D* g% 0 *

~., w4 --

sawss e.wamum .crracy s. oiancoLa -g g t,. q !s-moscar c.za=6cm wanwan c. m. u cataman s .$ p. - pe. ,g >j saNoma c.roLsoM A Q CCN s.

ocnamo c.oaLcN.

mascar e.aosem Ettvem u. Lucas

-amera n. wiec=srem vuonM a. samo6cm March 25 8 1981 M QJ/

James P. Gleason, Esquire Mr. Glenn O. Bright Chairman. Atomic Safety and Licensing Atomic Safety and' Licensing Board Board Panel 513 Gilmoure Drive C.S. Nuclear Regulatory Commission Silver Spring, Maryland 20901_ Washington, D.C. 20555 Dr. Jerry R. Kline Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 In the Matter of I)So3 S Union Electric Company (Callaway Plant, Unit 1)

Docket No. STN 50-483 OL f[

Administrative Judges Gleason, Bright and Kline:

.Please find enclosed, by way of official service, copies of the following documents which were provided' informally to the Board and the parties present at the special prehearing

- conference on March;24, 1981,.in Jefferson City, Missouri:

1.

" Applicant's Proposed Schedule.for Further Actions in the. Proceeding"; and,

" Applicant's Response to Contention 2 Proposed by

-Joint Intervenors."

4 3810;40705(,/

G-

SHAW, PlTTMAN, POTTS & TROWBRIDGE James P. Gleason, Esquire Mr. Glenn O. Bright Dr. Jerry R. Kline March 25, 1981 Page Two As I explained at the conference, the written response is to Joint Intervenors' Contention 2 as presented in their amended petition of March 6, 1981. Joint Intervenors filed a revised version of Contention 2 at the prehearing conference on March 24. Applicant's written response is still applicable to the introductory four paragraphs of the revised Contention 2 and to paragraph "F" (addressed as "2.G" in Applicant's response).

While Applicant did not object to the litigation of paragraph "I" of the revised contention, please see Applicant's written comments (labeled "2.K") on the litigation of low-level radiation health effects.

Respectfully submitted, Thomas A. Baxter Counsel for Applicant TAB:jah Enclosures cc: per Certificate of Service l

l o

  • - ,y, y -.-+- - ,

UNITPD STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

UNION ELECTRIC COMPANY ) Docket No. STN 50-483 OL

)

j (Callaway Plant, Unit 1) )

l CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing letter to the Atomic Safety and Licensing Board and the attached

" Applicant's Proposed Schedule for Further Actions in the Proceeding" and " Applicant's Response to Contention 2 Proposed by Joint Intervenors" were served this 25th day of March,1981 by ' deposit in the U.S. mail, first class, postage prepaid, to the parties identified on the attached Service List.

-~ ,

Thomas A. Baxter i

s l

l

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

UNION ELECTRIC COMPANY ) Docket No. STN 50-483 OL

)

(Callaway Plant, Unit 1) )

SERVICE LIST James P. Gleason, Escp.!r3 Kenneth M. Gackes, Esquire Chaiz:ran Chackes and Hoare Atcmic Safety and Licensing Board 314 N. Broackay 513 Gil:rcure Drise St. Icuis, Missouri 63102 Silver Spring, Marflard 20901 Mr. Jchn G. Feed Mr. Glenn O. Bright Ibute 1 Atcxr.ic Safety ard Licensing Ki.'gdom City, Missouri 65262 Board Panel U.S. Nuclear Pegulatory Ccarission Mr. Howard Steffen Washington, D.C. 20555 car:cis, Misscuri 65024 Dr. Je1TI R. Kline Mr. Farold Icttrarm Atcmic Safety and Licensing Route 1 Board Panel Owensville, Missouri 65066 l U.S. Nuclear Regulatory Cemrdssion l Washingtcn, D.C. 20555 Mr. Earl Brown P.O. Box 146 i Poy P. Iessy, Jr. , Esquire Auxvasse, Missouri 65231

! Office of the Executive Iagal Director U.S. Nuclear Regulatory Ctmrissicn Mr. Fred Luekey Washington, D.C. 20555 Rural Boate Rhineland, Missouri 65069 Docketing and Service Sec* h Office of the Secretary Mr. Sart:uel J. Birk U.S. Nuclear Regulatory Ccanission P.O. Box 243 l

Washington, D.C. 20555 berrison, Plssocri 65061

, Joseph E. Birk, Esq h Mr. Ibbert G. Wright Assistant to the General Counsel Poute #1 Union Electric Ocrrpany Fulten, Missouri 65251 P.O. Box 149 St. Icuis, Misscuri 63166 Treva J. Hearne, Esquire l Deputy General Counsel Missouri Public Service Ccmnission P.O. Box 360 Jefferson City, Missouri .65102

- March 24, 1981 i ! UN

/" 5 x UNITED STATES OF AMERICA /

NUCLEAR REGULATORY COMMISSION j' ec0

-i s G3' BEFORE THE ATCMIC SAFETY AND LICENSING BOARD .

oc . , -

. In the Matter of )

'- .3

) ' Q l1~Q f UNION ELECTRIC COMPANY ) Docket No. STN 50-483 OL

)

(Callaway Plant, Unit 1) )

l APPLICANT'S PROPOSED SCHEDULE FOR FURTHER ACTIONS IN THE ?ROCEEDING Discovery commences: Date of issuance of special prehearing conference order establishing the issues to be heard.

Filing of first round discovery requests: No later than 45 days folicwing the date of issuance of the scecial prehearing conference order.l.7 ,

Filing of responses'to first round discovery requests: No later than 90 days following

.the date of issuance of the saecial prehearing conference order.l',2/

Filing of second round discovery. requests: No later than 120 days.following the date of issuance of the special prehearing conference order.1,3/

Filing of responses to second round discovery-requests: No'later than 150 days following the date of' issuance of the special prehearing conference order.1,2/

Filing of direct, written testimony on Joint Inter-venors' Contention 1 (construction defects): No later than 165 days following the date of issuance of the s ecial.

prehearing conference order.l.

4 e

1 .

i l

, .2-1 Hearing commences in St. Louis on Joint Intervenors' Con-tention 1, any prehearing conference under S 2.752 l

to be held at the opening session: No later than 180 days following the date of issuance of the soecial prehearing conference order.1/

1 l

Filing of direct, written I testimony on environmental L matters (Joint Intervenors' l Contention 2): No later than 15 days prior to the commencement of the hearing on environmental matters (Joint Inter-venors' Contention 2).4/

! Hearing commences in St.

Louis on environmental

,' matters (Joint Inter-venors ' Contention 1) : 60 days after issuance of the

! NRC Staff's Final Environmental '

l Statement.4/

Filing of direct, written testimony on emergency

planning:- No later than 15 days prior to the commencement of the hearing l

cni emergency planning.5/

[ Hearing commences in'the l Callaway site area on l . emergency planning (Reed contentions): 60 days after issuance of the l

L chapter of the NRC Staff's Safety Evaluation Report which evaluates j

emergency planning.5/

1/ The Board would select a calendar business day on this basis and specify that.date in the portion of the special prehearing i

l ~ conference order which' addresses the schedule for.further actions  ;

inLthe proceeding.

2/ Except that: (1) in_the case of interrogatories, any

-objections shall: be served within 14 days after service of "

[ the interrogatories; (2) in the ' case of requests pursuant

- to-10 C.F.R. S 2.741-(producrion'of documents, etc.), any .

objections shall be served within 30 days after service of the: request.

i ,

e*

f

3/ Further discovery requests may be filed only with the Board's permission. A party seeking additional discovery must Jile the discovery request with the Board, supported by a me:f on setting forth the basis for the untimely request.

An acceptable basis will be that material new information has arisen which has not known, or could not with reasonable dili-Jence have been known, at the time set for discovery, and that the untimely request was filed within 30 days after the new information became known or with reasonable diligence should have become known.

4/ The Board would select a calendar business day on this Easis and specify that date in a scheduling order to be issued hmmediately following publication of the NRC Staff's Final Environmental Statement, 1 N At that time, the Board may also schedule a prehearing conference to consider the matters identified in 10 C.F.R. S 2.752.

5/ The Board would select a calendar business day on this Easis and specify that date in a scheduling order to be issued immediately following publication of the chapter of the NRC Staff's Safety Evaluation Report which evaluates emergency planning. At that time, the Board may also schedule a prehearing conference to consider the matters identified in 10 C.F.R. 5 2.752.

l l

I l