Interim Deficiency Rept 8 Re Reactor Vessel Broken Anchor Bolts,Initially Reported on 791012.Encl Repts Establish That Root Cause for Excessive Hardness Was Tempering of Some Studs at Lower than Min Temp.Addl Rept to Be Sent by 810724
Date released: 12/25/2019 Download: ML19345G578


Continued Investigation of Failure of Midland Unit 1 RPV Anchor Studs, Analysis Rept
ML19345G581
Person / Time
Site: Midland
Issue date: 02/11/1981
From:
TELEDYNE ENGINEERING SERVICES
To:
References
Download: ML19345G581 (27)
Continued Investigation of Failure of Midland Unit 1 RPV Anchor Studs, Data Rept
ML19345G580
Person / Time
Site: Midland
Issue date: 02/11/1981
From:
TELEDYNE ENGINEERING SERVICES
To:
References
Download: ML19345G580 (57)
Interim Deficiency Rept 8 Re Reactor Vessel Broken Anchor Bolts,Initially Reported on 791012.Encl Repts Establish That Root Cause for Excessive Hardness Was Tempering of Some Studs at Lower than Min Temp.Addl Rept to Be Sent by 810724
ML19345G577
Person / Time
Site: Midland
Issue date: 03/31/1981
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19345G577 (2)